• The ceiling system should satisfy these requirements that using lower chord ball as fixed point, adapting space change of hyperboloid steel grid, grid settlement under snow load.

    天花体系满足屋面网架下弦固定点适应双曲面空间变化、网架荷载作用下沉、热胀冷缩等变形运动。

    youdao

  • Concrete was poured in separately from mid-span of arch slab to the supports and then from the supports to the top chord of the arch chord so as to balance the pouring load.

    分两组下弦中同时拱板支座浇筑混凝土然后拱板支座连续沿拱板上弦中间合龙,使浇筑荷载相对均衡

    youdao

  • The chord and web members are all seamless steel tube. The ANSYS software is used to analyze the structure bearing capcity under main load combinations.

    采用ANSYS软件,对结构主要荷载组合工况的结构受力进行了分析,结果表明,结构受力合理,构件强度满足要求。

    youdao

  • The chord and web members are all seamless steel tube. The ANSYS software is used to analyze the structure bearing capcity under main load combinations.

    采用ANSYS软件,对结构主要荷载组合工况的结构受力进行了分析,结果表明,结构受力合理,构件强度满足要求。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定