This paper introduces the reformation of the station-service power supply equipment at Chencun Hydropower Station.
介绍了陈村水电站厂用电系统设备技术改造情况。
The geological condition of Chencun Dam foundation is complicated, and the curtain of foundation has been grouted a few times.
陈村大坝坝基地质条件复杂,对坝基帷幕进行了多次灌浆补强。
This paper introduces the application and operation of SJ-12C microcomputer automatic synchronization device at Chencun Hydropower Station. The realization of the functions are fairly perfect.
介绍了sj—1 2 C型微机自动准同期装置在陈村水电站水轮发电机组上的应用与运行情况,装置目前实现的功能比较完善。
This paper introduces the application and operation of SJ-12C microcomputer automatic synchronization device at Chencun Hydropower Station. The realization of the functions are fairly perfect.
介绍了sj—1 2 C型微机自动准同期装置在陈村水电站水轮发电机组上的应用与运行情况,装置目前实现的功能比较完善。
应用推荐