To consider and place the machines inside of the workshop, this method analysis with flow process chart and flow circuitry chart.
该方法运用流程程序图和流程线路图的分析,来思考和布置车间内部的机器。
In the process of well test, the manual methods, estimating method and interpolation by chart, are usually used to deal with surface data, which are tedious and have great errors.
油气井测试过程中,处理地面数据的常用方法是估计估算、查表插值的手工法,这种方法既繁琐且误差大。
A process chart for quick casting based on this method was presented, and a metal part was produced.
本文给出了由此方法实现快速铸造的工艺方案,并进一步实现了金属零件的快速铸造。
Chart trail law is the effective method to the solution of complex parts process size and tolerance using size chain principle.
图表跟踪法是利用尺寸链原理,求解复杂零件工序尺寸与公差的行之有效的方法。
This model is nonlinear mixed integer programming and can be solved with neural network method and the chart of computer calculation process is also given.
该模型属非线性混合整数规划问题,采用神经网络方法求解,并给出了计算机软件算法框图。
The method and importance of making flow chart of technological process in grain mills by interactive computer graphics are presented in this paper.
本文介绍了利用交互性计算机绘图技术,绘制粮食工厂工艺流程图的方法和意义。
At last, control chart and process capability analysis method is used to control and monitoring G1G2 production to prevent abnormal fluctuations and guarantee the improve results.
应用控制图和过程能力分析方法对G1G2生产实施控制和监测,以防止异常波动,保证改善成果。
In this paper the method on T2 control chart, by which the sample mean vectors of several related quality characteristics are controlled simultaneously in a process, is introduced.
介绍了工序中同时控制多个相关质量特性均值向量的T2控制图方法。
An effective spot-control method with control chart has been made in productive process, and obvious improvements are obtained in practice.
利用控制图对工序进行了有效的现场控制并在实践中取得了明显的改进。
Once more, the third chapter, in the preliminary design process, the use cause and effect chart analytic method, searches the preliminary design stage quality control the key point.
再次,第三章,在初步设计过程中,利用因果图分析法,查找出初步设计阶段质量控制的关键点。
Once more, the third chapter, in the preliminary design process, the use cause and effect chart analytic method, searches the preliminary design stage quality control the key point.
再次,第三章,在初步设计过程中,利用因果图分析法,查找出初步设计阶段质量控制的关键点。
应用推荐