• To consider and place the machines inside of the workshop, this method analysis with flow process chart and flow circuitry chart.

    方法运用流程程序流程线路分析思考布置车间内部机器

    youdao

  • In the process of well test, the manual methods, estimating method and interpolation by chart, are usually used to deal with surface data, which are tedious and have great errors.

    油气井测试过程处理地面数据常用方法估计估算、查插值手工这种方法繁琐误差

    youdao

  • A process chart for quick casting based on this method was presented, and a metal part was produced.

    本文给出了由此方法实现快速铸造工艺方案,进一步实现了金属零件的快速铸造。

    youdao

  • Chart trail law is the effective method to the solution of complex parts process size and tolerance using size chain principle.

    图表跟踪利用尺寸原理求解复杂零件工序尺寸公差行之有效方法

    youdao

  • This model is nonlinear mixed integer programming and can be solved with neural network method and the chart of computer calculation process is also given.

    模型非线性混合整数规划问题采用神经网络方法求解,并给出了计算机软件算法框图

    youdao

  • The method and importance of making flow chart of technological process in grain mills by interactive computer graphics are presented in this paper.

    本文介绍利用交互性计算机绘图技术,绘制粮食工厂工艺流程图方法意义

    youdao

  • At last, control chart and process capability analysis method is used to control and monitoring G1G2 production to prevent abnormal fluctuations and guarantee the improve results.

    应用控制过程能力分析方法G1G2生产实施控制和监测,以防止异常波动保证改善成果

    youdao

  • In this paper the method on T2 control chart, by which the sample mean vectors of several related quality characteristics are controlled simultaneously in a process, is introduced.

    介绍了工序同时控制多个相关质量特性均值向量T2控制方法

    youdao

  • An effective spot-control method with control chart has been made in productive process, and obvious improvements are obtained in practice.

    利用控制工序进行了有效的现场控制实践中取得了明显改进

    youdao

  • Once more, the third chapter, in the preliminary design process, the use cause and effect chart analytic method, searches the preliminary design stage quality control the key point.

    再次第三初步设计过程中利用因果分析法查找出初步设计阶段质量控制关键点

    youdao

  • Once more, the third chapter, in the preliminary design process, the use cause and effect chart analytic method, searches the preliminary design stage quality control the key point.

    再次第三初步设计过程中利用因果分析法查找出初步设计阶段质量控制关键点

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定