Some of these may change order according to the specific situation or your own preferences; for example, a handwritten note might seem more personal than voice-mail.
其中一些选择可能会根据特定的情况或个人的偏好而改变顺序;例如,手写便条可能比语音邮件更加私人化。
Traditional CBT is considered an effective form of talk therapy for depression, helping people challenge negative thoughts and change the way they think in order to change their mood and behaviors.
传统的认知行为治疗(CBT)被视为治疗抑郁症的一种有效的谈话疗法,其能够帮助人们挑战消极思想,改变思维方式,从而改变他们的情绪和行为。
In order to "change lives for the better" and reduce "dependency", George Osborne, Chancellor of the Exchequer, introduced the "upfront work search" scheme.
为了“改善生活”和减少“依赖”,英国财政大臣乔治·奥斯本推出了“前期工作搜索”计划。
He came up with a simple, but brilliant, solution: Change the order of my work day.
我丈夫给出了一个简单但又聪明的解决方案:调整我每天工作的顺序。
允许改变标签顺序。
Do not change the order of the elements on the schema when the queries consider ordered predicates.
如果查询涉及到顺序谓词,不要改变模式中的元素顺序。
Drag the columns to change the order in which they are displayed.
拖动列可以改变它们显示的顺序。
Sometimes you may want to change this order or perhaps only specify values for columns that have NOT NULL constraints.
有时候您希望更改这种顺序或可能希望只为具有NOT NULL约束的列指定值。
Novice users can easily drag elements around the diagram to change the order of the data elements in the schema.
新手可以轻松地在图上拖动元素,从而改变数据元素在模式中的次序。
The change to the task order did flow back however.
但是,对任务顺序的更改确实会流回业务模型。
You can change the order of execution by skipping phases or leaving the lifecycle altogether.
您可以通过忽略某个阶段或合并整个生命周期从而对执行顺序进行修改。
We can use the arrow buttons to change the column order, too.
使用箭头按钮可以更改列的顺序。
You can also use the Reorder ICONS to change the order in which the attributes are concatenated.
您还可以使用Reorder图标来更改对属性进行连接的顺序。
Did you have to change your life in order to reach your goals?
你是否不得不改变自己的生活以达到自己的目标呢?
Each change is tracked through the work order identifying who made the change and when.
每一次更改都通过标识谁进行了更改和何时更改的工作命令进行跟踪。
What routines would I need to change in order to exercise?
为了锻炼,我需要改变哪些日常安排?
In other cases, I may want to only include certain fields in the output, change the order, change the identifier text used for a value, or even skip the identifier text completely.
在其他情况下,我可能想要在输出中仅包含某些字段、更改顺序、更改用于值的标识符文本,或者甚至完全跳过标识符文本。
Changing the order in which the widget constructors are called is not possible, since this would change the order in which the widgets are packed.
不可能改变窗口小部件构造函数的调用次序,因为这将改变窗口小部件包装的次序。
You can change the deploy order in the Deployment Group editor.
可以在部署组编辑器中修改部署次序。
First-order change involves doing better what we already do, while second-order change alters the core ways we conduct business or even the basic business itself.
一阶变化侧重于把现在正在做的是做的更好,而二阶变化改变了我们从事的事业甚至基础生意本身的核心内容。
The presented scenario shows collaboration in the context of engineering change order.
视频展示了在工程变更单情景下的协作。
All right. Nonetheless, even with this change, what's the order growth for bubble sort?
好的,不管怎么样,尽管这发生了,冒泡排序的增长率是多少呢?
A: How do you process a change of order?
A:更改订单的程序是怎样的?
When the confirm order is sent to the service consumer, the consumer might change the order (for example, the user might change the quantity due to a change in price) and place the buy order again.
当确认订单发送到服务消费者时,消费者可能会修改订单(例如,客户可能会因为价格改变修改数量),并再次下购买订单。
Can we make a change on order No. 29734?
我们可以修改一下29734号订单吗?
Can we make a change to order No. 29734?
我们可以修改一下29734号订单吗?
What needs to change in order to minimize stress and drama?
缓解压力和戏剧性需要做些什么?
Golembiewski, Billingsley, and Yeager8 subsequently added another level of change, defining middle-order change as lying somewhere between the extremes of first - and second-order change.
戈伦比威斯基,比林斯利和耶格尔随后加入了另一个级别的变革,中阶变化。中阶变化是存在于一阶和二阶变化这两个极端之间的变化。
Golembiewski, Billingsley, and Yeager8 subsequently added another level of change, defining middle-order change as lying somewhere between the extremes of first - and second-order change.
戈伦比威斯基,比林斯利和耶格尔随后加入了另一个级别的变革,中阶变化。中阶变化是存在于一阶和二阶变化这两个极端之间的变化。
应用推荐