• CCEC and SCEC management inspect Shun Fung's CCS recognized Marine genset testing system.

    重庆康明斯和深圳崇发领导视察顺风公司的CCS认可船用发电机试验系统。

    youdao

  • CCEC mission demands that everything we do leads to a cleaner, healthier and safer environment.

    重庆康明斯的使命要求我们致力于创建一个更加清洁、健康和安全的环境。

    youdao

  • The sports meeting of CCEC can play a positive role in building team spirit and unleashing the power of employees.

    CCEC举办员工运动会对培养团队精神,释放员工能力将起动非常积极的作用。

    youdao

  • On Mar 22, 2014, Employees from Chongqing Cummins Engine Co., Ltd. (CCEC) participated in the 2014 Chongqing International Marathon.

    2014年3月22日,重庆康明斯发动机有限公司组织员工参加了2014重庆国际马拉松赛。

    youdao

  • During the visit, organizers introduced the diversity culture and engines of CCEC to them in the form of story and 3d spatial model respectively.

    在参观活动中,组织者用故事的形式介绍了康明斯多元化文化,采用三维空间模型介绍了公司生产的发动机。

    youdao

  • CCEC will set substantial and measurable objectives in managing health, safety and the environment and commit to continual improvement in these areas.

    通过设立具体、可测量的目标进行健康、安全、环保管理,并致力于持续改进。

    youdao

  • Chongqing Commins (CCEC) engines are small, light, reliable in working, and convenient to get fittings and to maintain, and also low in fuel consumption.

    重庆康明斯发动机体积小、重量轻、油耗低、工作可靠,配件供应及维修方便。

    youdao

  • He said, "CCEC is accelerating its progress to be at a global quality level. I need to attend many meetings and work at my desk for a long time every day."

    他说:“公司开始了加速实现全球质量水平的征程,为此,我每天都要参加大量的会议,在办公桌前工作很长的时间。”

    youdao

  • Through visiting the main machining workshops and assembly workshop of CCEC, the delegation gained an initial understanding of products and production status of the company.

    考察团参观了重庆康明斯主要的机加工车间、装配车间,对公司的生产情况和产品有了初步了解。

    youdao

  • Immediately after forming the joint venture, CCEC invested almost Rmb 200 million in technical renovation and capital improvements, both to increase capacity and to improve quality.

    合资以后公司即投入了大约2亿元人民币,用于技术改造以改进质量和扩大生产能力。

    youdao

  • Immediately after forming the joint venture, CCEC invested almost Rmb 200 million in technical renovation and capital improvements, both to increase capacity and to improve quality.

    合资以后公司即投入了大约2亿元人民币,用于技术改造以改进质量和扩大生产能力。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定