In CBM well drilling construction, oil drilling techniques are basically adopted.
煤层气钻井施工中,基本上采用石油钻井工艺。
In CBM well drilling construction, oil drilling techniques are basically adopted.
在煤层气钻井施工中,基本上采用石油钻井工艺。
Fracturing fluids and propping agents are the essential materials for CBM well fracturing to increase yield.
压裂液和支撑剂是煤层气井压裂增产措施的基本材料。
Production system which control the CBM well output fluctuation is a key factor to ensure production successfully.
排采制度是保证煤层气井生产排采成功的关键要素。
CBM well group drainage and mining testing data indicated that the coupling of methane content, fissure development extent and hydrodynamic condition is necessary terms to ensure stead...
煤层气井组排采试验资料表明,甲烷含量、裂隙发育程度、水动力条件三者的耦合是保证煤层气井稳定高产的充分必要条件。
These three kinds of techniques of well testing, step rate test and injection test at pre-fracturing are conducted to acquire formation parameters and applied in one CBM well successfully.
将地层测试、升排量注入与压降测试、注入与压降测试三种测试工艺在煤层气井压裂前实施,以获取地层参数,并将这三种方法在同一口煤层气井上成功进行了应用。
BPM and direct requirements analysis through stakeholder interviews and CBM are an obvious and well-suited way of identifying candidate services.
通过项目相关人员的会谈和CBM来进行BPM和直接需求分析是一个容易理解且非常合适的标识候选服务的方法。
During the process of CBM development, well testing, as the means for formation parameters and the quantitative and qualitative evaluation to coal bed, is an important link.
煤层气开发过程中,试井测试作为求取地层参数及对煤层进行定量和定性的评价的手段,是不可或缺的重要环节。
This paper analyzes the current planned maintenance system problems, put forward the necessity of CBM as well as specific practices.
文章主要剖析了当前计划性检修制度存在的问题,提出了实施状态检修的必要性以及具体的实践方法。
For Coal Bed Methane (CBM) production, the pore passage must be established between natural fracture and well bore.
开采这种气体必须在煤层的天然裂缝与井筒之间建立起有效的连通孔道。
The condenser CBM system provides a guarantee for condenser's good operation as well as the security, the regular operation and the economic operation of power plants.
凝汽器故障诊断系统为凝汽器的良好运行提供了保证,同时也为发电机组的正常运行,以及电厂的安全、经济运行提供了可靠保证。
The method fits the management and maintenance of the equipment very well in Bao Steel and is of great importance to realizing the Condition Based maintenance (CBM) of the equipment.
这种方法对宝钢的设备管理与维修是非常适用的。在设备实现状态维修管理(CBM)中具有重要的意义。
The recovery ratio, recovered percent, drainage range and the production forecast of single coal-bed methane (CBM) well were discussed by using the production data of Zaoyuan well pattern.
利用试验井网的生产资料,探讨了煤层气的采收率、采出程度、降压范围和单井产能预测。
The recovery ratio, recovered percent, drainage range and the production forecast of single coal-bed methane (CBM) well were discussed by using the production data of Zaoyuan well pattern.
利用试验井网的生产资料,探讨了煤层气的采收率、采出程度、降压范围和单井产能预测。
应用推荐