• A synthetic dynamic schedule scheme, integrating with man-machine interactive and combining with many methods, is presented and applied in steelmaking and continuous casting schedule system.

    本文提出了人机协调多种方法组合、四维一体综合集成的动态调度方案,并开发炼钢连铸调度系统中得到了具体的应用

    youdao

  • Schedule rules for two-strand thin slab casting and rolling were established.

    首先建立了两流薄板坯连铸连轧流程生产调度规则库。

    youdao

  • This system can solve the dynamic schedule problem of two-strand thin slab casting and rolling and optimize production management.

    调度系统可以较好地解决两流薄板坯连铸连轧流程动态调度问题进一步优化生产组织。

    youdao

  • This system can solve the dynamic schedule problem of two-strand thin slab casting and rolling and optimize production management.

    调度系统可以较好地解决两流薄板坯连铸连轧流程动态调度问题进一步优化生产组织。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定