The paper describes the building-up process of a large size rotary jet slip-casting pile by quick pore-forming in bulky iron slag layer and in river banks floated pebble bed.
阐述了在松散渣铁层及河岸漂卵石层中快速成孔,形成较大直径的旋喷注浆桩的过程。
Objective: To study clinical importance of casting pile-core crown with negative pressure suction silastic impressions and analyze reasons for the failure of routine impressions in pile-core crown.
目的:探讨铸造桩核冠常规印模过程中失败的原因,研究负压抽吸硅橡胶印模应用于铸造桩核冠的临床意义。
Objective To note that the traditional pile of metal casting is still the important methods for root and crown restoration.
目的说明传统的铸造金属桩核仍是修复残根残冠的重要方法。
At present, piles with circular are used in all casting bore-hole pile foundations, but these piles have smaller perimeter and smaller section modulus as compare with the rectangular ones;
目前钻孔灌注桩基中的桩均为园形截面,和矩形截面的桩相比,园桩的周长、断面系数较小,抗弯能力差。
Casting mass concrete of pile caps in long-span continuous rigid frame bridge is one of the key processes during bridge construction.
大跨连续刚构桥大体积混凝土承台浇注是桥梁施工的关键工序之一。
Casting mass concrete of pile caps in long-span continuous rigid frame bridge is one of the key processes during bridge construction.
大跨连续刚构桥大体积混凝土承台浇注是桥梁施工的关键工序之一。
应用推荐