• On the basis of those key problems, the application of case based reasoning in resource requirements was discussed and the basic structure of the master production scheduling system was proposed.

    为了快速、准确地获得最佳生产计划分析主生产计划系统关键问题基础上,探讨了基于事例推理技术在资源需求求解中的运用,提出了基于事例推理的主生产计划系统基本结构

    youdao

  • In the case of file-sharing copyrighted content, the big advantage (apart from not paying for stuff) is the ability to ignore program scheduling or territorially-based release Windows.

    共享受版权保护内容时,好处除了不用付钱之外,用户还可以突破时间地域限制。

    youdao

  • In the case of file-sharing copyrighted content, the big advantage (apart from not paying for stuff) is the ability to ignore program scheduling or territorially-based release Windows.

    共享受版权保护内容时,好处除了不用付钱之外,用户还可以突破时间地域限制。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定