• A general model based on linear programming for short-term generation scheduling of cascade hydroelectric systems is proposed.

    建立了基于线性规划梯级水电系统短期发电计划通用模型

    youdao

  • The Hutiaoxia Hydroelectric Project is a backbone power station of the cascade hydroelectric stations on the middle and lower reaches of the Jinsha River.

    虎跳峡水电站金沙江中下游梯级龙头电站,该电站开发建设金沙江水电梯级开发“西电东送”的实施具有重要的战略意义;

    youdao

  • All the problems mentioned above, restrict the cascade development of Huanghe River's hydroelectric.

    所有这些问题的存在,严重制约黄河上游水电梯级滚动开发

    youdao

  • Hydroelectric plant operation is based on an operation chart. Most of the existing literatures, however, paid much more attention to the single reservoir chart than cascade reservoirs.

    水库调度水电站发电调度运行基础然而现有研究和算法大都集中库调度图,库群发电调度图成果较少。

    youdao

  • Hydroelectric plant operation is based on an operation chart. Most of the existing literatures, however, paid much more attention to the single reservoir chart than cascade reservoirs.

    水库调度水电站发电调度运行基础然而现有研究和算法大都集中库调度图,库群发电调度图成果较少。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定