If the excavation is more than 4 meters in depth, he will assign a Civil Engineer to provide a load calculation, shoring design and oversee the shoring construction during excavation.
如果挖掘深度超过4米,要指派一名土建工程师进行负荷计算、支护设计并在开挖期间监督支护施工。
Combining with the method and measures of the practical application of the project, the fine calculation of the complexity region is realized, meet the actual needs of landscape engineer.
针对大型园林景观工程土方计算的特点,提出了考虑复杂边界确定的三角网的土方计算方法。
The methods of dealing with the contact problems by the finite element method are researched in this thesis, and calculation and analysis combining engineer examples are carried on.
本文就采用有限元法求解接触问题进行了研究,并结合工程实例做了计算与分析。
The methods of dealing with the contact problems by the finite element method are researched in this thesis, and calculation and analysis combining engineer examples are carried on.
本文就采用有限元法求解接触问题进行了研究,并结合工程实例做了计算与分析。
应用推荐