• Benefit is calculated on the basis of average weekly earnings.

    补助金平均收入计算。

    《牛津词典》

  • Interest is calculated on the monthly bases.

    利息是以月为单位计算

    youdao

  • Is calculated on base rent not gross rent.

    基本房租而不是按总房租计算

    youdao

  • Is depreciation calculated on a straight line basis?

    折旧费采用直线折旧法来计算的吗?

    youdao

  • Hash value is calculated on the basis of the RDN of the entry.

    散列根据条目RDN计算出来的。

    youdao

  • Is the fee calculated on the total amount payed by the sender?

    总量上受到发送方计算费用

    youdao

  • That's because quake magnitudes are calculated on a logarithmic scale.

    是因为地震级数按对数计算的。

    youdao

  • The way partitions really work is that a hash code is calculated on the key.

    分区工作方式计算散列

    youdao

  • These difficult problems may be calculated on computer both quickly and accurately.

    这些难题能用计算机准确地计算出来

    youdao

  • Survival rates are calculated on the number of people alive five years after diagnosis.

    存活率计算基于确诊年后存活数量

    youdao

  • An example has been calculated on computer and satisfactory results have been obtained.

    通过实例计算机进行了计算,获得了满意结果

    youdao

  • The amount of cash will be calculated on a number of points allocated for each good deed.

    奖励金额按照每件好事所分配若干分值计算

    youdao

  • The estimation of the chromaticity of the incident light is calculated on the chromaticity plane.

    然后通过在色度平面上分析,估计入射色度值。

    youdao

  • The network time is calculated on the client and represents the time spent blocking on network I/O.

    网络时间客户计算时间表示花费在网络 I/O堵塞上的时间。

    youdao

  • Note: the age of an item is calculated on the later of the Sent date and Modification date of the item.

    注意项目计算时间该项目的“发送时间修改时间”较晚的时间算起。

    youdao

  • Land tax is calculated on the combined value of all the taxable land you own above the land tax threshold.

    土地计算针对拥有的所有起征点以上土地价值

    youdao

  • The royalty rate shall be calculated on the net sales of the products turned out with transferred technology.

    专利权使用费率根据转让技术生产产品销售来计算

    youdao

  • The energy leakage of channel impulse response is enough calculated on non-sample spaced channel in this method.

    方法充分考虑了非采样间隔信道冲激响应能量泄漏问题。

    youdao

  • The Y-axis scaling factor is calculated on line 104 in the exact same way as in the bar chart example (see Listing 2).

    y比例因子第104计算的,方法上面状图使用的方法一样(请参阅清单2)。

    youdao

  • The Y-axis scaling factor is calculated on line 104 in the exact same way as in the bar chart example (see Listing 2).

    Y比例因子第 104计算的,方法上面状图使用的方法一样请参阅清单2)。

    youdao

  • The temperature and moisture distribution can be calculated on the premise of material characteristic parameters.

    已知物料特性参数前提下,能够计算出颗粒料温度分布水分分布。

    youdao

  • In some cases you can save up to 10% of your interest rates, which is a lot of money when calculated on a yearly basis.

    某些情况下可以节省高达10%,利率很大钱,计算逐年。

    youdao

  • The first two digits refer to the approximate percentage content of the hydroxypropoxy group, calculated on a dry basis.

    两个阿拉伯数字表示大概丙基含量, 是干燥的基础上计算的。

    youdao

  • That's the upshot of the orbital elements calculated on Monday by Brian G. Marsden (Smithsonian Astrophysical Observatory).

    Brian G . Marsden(史密松天体物理天文台)星期一时候根据它的轨道参数所得出结论

    youdao

  • The frequency field is calculated on the basis of first filter result. The adaptive filter is carried out to every block at last.

    第一次滤波基础计算频率,最后针对每个分块区域进行适应增强滤波。

    youdao

  • Unless otherwise specified in Loan Agreement, interest accrues on a daily basis and is calculated on the basis of a 365-day year.

    贷款协议书另有注明外,利息逐日累算,按年365日基准计算

    youdao

  • The listing shows the variable "diff" being calculated on line 6, which we can re-evaluate by supplying the "diff" expression to print as 'print no1 - no2'.

    清单显示了第 6计算变量 "diff",我们可以打印 "diff"表达式(使用'printno1-no2' 命令),来重新估计这个变量。

    youdao

  • Total work period of main installation of project shall be 100 days which be calculated on and from the date at which contractor access practically to project site.

    本合同工程安装主体工期100,以施工单位实际进场日起开始计算

    youdao

  • Total work period of main installation of project shall be 100 days which be calculated on and from the date at which contractor access practically to project site.

    本合同工程安装主体工期100,以施工单位实际进场日起开始计算

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定