Information technology - Cabling installation - Part 2: installation planning and practices inside buildings.
信息技术。电缆安装。第2部分:建筑物内部的安装规划和操作规程。
These tasks include information gathering , site preparation works , lead time for works , funding arrangement , site acceptance , cabling works and equipment installation.
该等工作包括搜集资料,准备工作,工程之预备时间,拨款的安排,场地之验收,导线工程及安装设备。
Use wired sensors monitoring network cabling composed of large quantity, installation and maintenance costs high, poor reliability, and in some parts of the complex building things cannot wiring.
使用有线传感器组成的监测网络布线量大、安装和维护费用高、可靠性差,并且在复杂楼宇物中的某些地方无法布线。
The AXIS 216fd-v Camera is powered via the network, reducing cabling requirements and installation costs.
AXIS 216fd - V摄像机通过网络供电,减少了电缆布线需求和安装成本。
The AXIS 216fd-v Camera is powered via the network, reducing cabling requirements and installation costs.
AXIS 216fd - V摄像机通过网络供电,减少了电缆布线需求和安装成本。
应用推荐