• Note: 1. The laying method in correspondence with D category in the table 1-18(GB/T16895.15-2002), which is suitable for the direct cable burying or cable layout in the underground conduit.

    1敷设方式对应1-18(GB/T16895.15-2002)中的D适用电缆直接埋地电缆敷设地下管道内

    youdao

  • For laying in doors, in tunnels, in cable trench or direct in ground, able to bear external mechanical forces, but unable to bear large pulling force.

    室内、隧道电缆沟埋地承受机械外力的场所,不能承受拉力

    youdao

  • For laying indoors , in tunnel, cable trench, or direct in ground, able to bear external mechanicalforces, but unable to bear large pulling force .

    室内隧道电缆沟内,敷设等,承受一定机械外力不能承受的拉力。

    youdao

  • For laying indoor, in tunnel, cable French, well or direct in ground, able to bear external mechanical forces and certain pulling force.

    室内隧道电缆沟内地下,能够承受一定机械外力一定的拉力。

    youdao

  • For laying indoor, in tunnel, cable French, well or direct in ground, able to bear external mechanical forces and certain pulling force.

    室内隧道电缆沟内地下,能够承受一定机械外力一定的拉力。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定