The maximum permitted average layout load curve chart for the steel step-type cable bridge at the different span.
梯级式钢制电缆桥架在不同跨距下最大允许均布载荷曲线图。
The maximum permitted average layout load curve chart for the steel slot-type cable bridge at the different span.
槽式钢制电缆桥架在不同跨距下最大允许均布载荷曲线图。
The maximum permitted average layout load curve chart for the glass steel slot-type cable bridge at the different span.
玻璃钢槽式电缆桥架在不同跨距下最大允许均布载荷曲线图。
This technology now reaches more than 70% of homes (see chart) and, unlike Verizon, the cable companies did not have to pay to replace the last mile.
这种技术已经应用到百分之七十的用户家里(看图)。与威瑞森不同,电缆公司不向用户索取最后线路的费用。
Based on the elastic concept this paper proposes the chart analysis method for estimation of seismic response of the selfanchored suspension cable bridge with steel box stiffening girder.
按弹性力学理论导得了体外预应力钢箱梁桥的变形分析方法 ,建立了简支索梁的基本概念及假设和基本平衡方程 ,采用伽辽金能量原理得到了平衡方程的解答。
Based on the elastic concept this paper proposes the chart analysis method for estimation of seismic response of the selfanchored suspension cable bridge with steel box stiffening girder.
按弹性力学理论导得了体外预应力钢箱梁桥的变形分析方法 ,建立了简支索梁的基本概念及假设和基本平衡方程 ,采用伽辽金能量原理得到了平衡方程的解答。
应用推荐