The mechanical works of hoistway and cabine as well as the electrical installation in the hoistway and controller have to be finished to guarantee runs in normal mode.
井道的机械工作,轿厢,电气零部件的安装,控制柜等必须在第一次正常运行前完成。 电气线路亦须完成及检查。
The mechanical works of hoistway and cabine as well as the electrical installation in the hoistway, controller and E&I Panel have to be finished to ensure inspection run.
必须完成井道和机房的机械工作以及在井道、控制柜和E&I板的电气安装以确保检修运行。
The mechanical works of hoistway and cabine as well as the electrical installation in the hoistway, controller and E&I Panel have to be finished to ensure inspection run.
必须完成井道和机房的机械工作以及在井道、控制柜和E&I板的电气安装以确保检修运行。
应用推荐