• This paper introduces a method used to forecast the attitude and character of buried fault and its position and displacement in front of mining roadway.

    介绍一种利用断层影响带参数掘进巷道前方隐伏断层产状性质、断层位置、断距进行超前预测方法

    youdao

  • This paper deals with the relationship between the fault movement and the pipe line deformation and presents some opinions as to how to design a buried oil and gas pipe line through fault area.

    本文讨论断层运动管道变形关系,从而对过断层区的埋地管道的设计提出了几点意见。

    youdao

  • The research of the response of buried pipeline crossing fault is very significant in lifeline earthquake engineering.

    断层埋地管线地震反应问题研究生命线地震工程重要内容之一。

    youdao

  • Take the measure of the breakdown of buried cable as an example, the measure method and the fixed-point skill of the buried cable fault were analyzed briefly.

    地埋电缆发生故障寻故障点,就地埋电缆故障测寻方法定点技巧进行简要分析

    youdao

  • The aseismic test of buried pipe crossing fault is conducted. Some m.

    首次进行了断层埋地管道抗震试验。取得了一些有益的结论。

    youdao

  • The response of buried pipelines crossing the fault is an important research content of lifelines earthquake engineering.

    断层埋地管线地震反应问题生命线地震工程的重要研究内容之一

    youdao

  • Because of the hazards made by seismic activity, at present more attention has been paid to the design of buried pipelines passing through active fault zone both at home and abroad.

    由于地震活动危害国内外目前穿过活动断层埋地管道设计均十分重视

    youdao

  • Buried depth of fault up-breakpoint is a important parameter in earthquake risk estimate of buried active fault.

    断层上断点隐伏活动断层地震危险性评价中的一个重要参数

    youdao

  • Especially for the buried cable, if the fault point can't be located quickly and precisely, it would expend a lot of time, funds and manpower.

    特别是对于电缆如果不能快速准确确定故障点位置,故障排除花费大量时间资金和人力。

    youdao

  • The fault characteristic periodic signals of the rolling bearing are in low frequency band and often buried in the noise.

    反映滚动轴承故障特征周期信号处于较低频带内容易噪声淹没,难以检测。

    youdao

  • Because the effect of the reverse fault is very complex, the study on the response of the buried pipelines due to the reverse fault is difficult and less to be carried out.

    由于断层埋地管线作用复杂性,管线跨逆断层反应研究具有一定的难度,这方面的工作开展较少

    youdao

  • These seismic analysis method of buried pipeline crossing fault in engineering practice are discussed and the current seismic measures for pipeline engineering in China are recommended.

    对常用跨断层管道抗震分析方法进行了评述列举了我国管道工程中可行的抗震措施

    youdao

  • Crossing Angle has small effect to the response of the buried pipeline under the action of the reverse fault.

    穿越角度跨逆断层埋地管线地震反应影响很小

    youdao

  • Some earthquakes produce spectacular fault scarps, and others are completely buried beneath the surface.

    一些地震会产生壮观的断层陡坡另一些则完全掩埋地表下。

    youdao

  • In the same time, the strain of seismic isolation pipe segment is compared with the strain of buried pipe across the fault.

    同时管段应变值与断层埋地管道应变值进行了比较分析。

    youdao

  • Damage reason of buried pipelines is primarily resulted from the overlaying soil rupture due to the earthquake fault dislocation.

    断层基岩错动引发覆土层破裂导致埋地管线破坏主要原因

    youdao

  • Negative reversal structures are the main factors of forming fault - block type buried hills and their structural evolution determined forming the fault - block type buried hills.

    反转构造潜山形成主要因素构造演化决定了断块型古潜山形成。

    youdao

  • Because the power cable is buried in the ground and its running environment is complicated, so the diagnosis of cable fault location is very difficult.

    电力电缆埋藏地下运行环境复杂因此进行电缆的故障诊断比较困难。

    youdao

  • In Can 2X1 small fault-block viscous oil reservoir in Jidong Oilfield, reservoir is buried deeply, boundary and bottom water is active.

    冀东油田2X1块稠油油藏埋藏较活跃,为此提出以热采作为该块的开发手段。

    youdao

  • Faults styles are mainly graben and step fault. Strata are little folded. Strata thickness and buried depth both decrease eastward and northward.

    盆地内的构造相对简单,断裂阶梯式组合为主,地层仅轻微褶皱且地层厚度向东及向减薄、变浅。

    youdao

  • Negative reversal structure and the fault - block type buried hills are very common in Palaeozoic group in Tongwang area of Dongying Sag.

    反转构造古潜山普遍存在于东营凹陷通王地区古生界之中。

    youdao

  • The risk assessment model for cathodic protection of buried gas pipeline is constructed with the modified fault tree method.

    结合某市工程实例,探讨了地理信息系统埋地燃气管道风险分析中的应用。

    youdao

  • Lithology traps and structural traps are mainly found in Mesozoic and Cenozoic strata, while fault block-buried hill traps are primarily in Paleozoic strata.

    中生界新生主要岩性圈闭构造圈闭,古生界的主要圈闭是潜山圈闭。

    youdao

  • When the fault displacement is same, the maximum axial compressive strain of the buried pipeline with different crossing Angle is very close.

    相同断层位错作用下不同穿越角度埋地管线最大轴向应变十分接近。

    youdao

  • Shule river fault zone is a buried deep basement fault zone, it locates in the Southof Beishan area in Gansu Province.

    疏勒断裂带位于甘肃省北山地区南缘,为隐伏基底断裂。

    youdao

  • The distribution of Paleozoic buried hills is controlled by regional fault.

    断裂控制古生界潜山分布

    youdao

  • These seismic analysis method of buried pipeline crossing fault in engineering practice are discussed and the curre…

    常用的跨断层管道抗震分析方法进行了评述,列举了我国管道工程中可行的抗震措施。

    youdao

  • While meeting the requirement of the minimum depth of the overlaying soil and the frozen depth, the cross-reverse fault pipeline is appropriate to be buried in shallow soil.

    跨逆断层管线满足管顶最小深度、土壤冰冻深度以及抗浮要求等前提下,

    youdao

  • While meeting the requirement of the minimum depth of the overlaying soil and the frozen depth, the cross-reverse fault pipeline is appropriate to be buried in shallow soil.

    跨逆断层管线满足管顶最小深度、土壤冰冻深度以及抗浮要求等前提下,

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定