• It introduces the problems during construction of the cast in situ concrete pile embedded in rocks for sand loading berth of Fuzhou Port bulk cargo (river sand) wharf and the countermeasures.

    文章介绍福州散货(河砂)码头工程泊位灌注桩施工中的难题处理对策。

    youdao

  • It introduces the problems during construction of the cast in situ concrete pile embedded in rocks for sand loading berth of Fuzhou Port bulk cargo (river sand) wharf and the countermeasures.

    文章介绍福州散货(河砂)码头工程泊位灌注桩施工中的难题处理对策。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定