• The wall is built of alternating sections of stone and earth, with some sections reaching a height of up to 4 meters.

    堵城墙石头泥土交替建造而成,有些路段达到4高度

    youdao

  • The pipeline bridge is built up with triangle sections, its shear stiffness can be derived from the stress diagram for the truss with triangle section.

    管道跨越工程中,常用三角形截面组合管拱,三角形截面受力分析图,分析推导出抗剪刚度

    youdao

  • The pipeline bridge is built up with triangle sections, its shear stiffness can be derived from the stress diagram for the truss with triangle section.

    管道跨越工程中,常用三角形截面组合管拱,三角形截面受力分析图,分析推导出抗剪刚度

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定