• One survey was done before the city had finished building a new light rail system, and the second was done from 12 to 18 months after the rail's completion.

    调查之前已经完成了新的轻型城市轨道交通系统建设第二轨道完成后12个月18月建设。

    youdao

  • But the survey also showed inflationary pressures are building.

    调查同时表明通货膨胀压力增大

    youdao

  • Building the base survey application.

    构建基础问卷调查应用程序

    youdao

  • We'll start by building the survey application, including providing the base class and extending the class with the question specific elements.

    构建问卷调查应用程序开始包括提供以及使用问题特定的元素来扩展这个类。

    youdao

  • In a 2006 survey, 30 percent of people without a high school degree said that playing the lottery was a wealth-building strategy.

    根据个2006年调查高中学历的人中30%表示彩票一个累积财富策略

    youdao

  • It's a good idea to plan ahead for a survey and start building a database of customer contact information.

    主意提前计划调查开始建立一个数据库客户联系信息

    youdao

  • While speaking to students, but many schools making a survey of sites: treatment of teaching the concept of campus involvement old primary school building site resistance.

    学生来讲但是许多学校网站制作调查表明对待校园网介入教学观念陈腐学校网站建设首要阻力

    youdao

  • Building an interface to our survey application using a servlet.

    使用Servlet您的问卷调查应用程序构建一个接口

    youdao

  • Incorporating the digital survey into the BIM database, gave a solid foundation to the decision making for the design intervention of this building.

    数字调查纳入BIM数据库,也是建筑干预性设计有了一个坚实基础

    youdao

  • Making a survey of buildings or building components goes hand in hand with renovation measures in all phases.

    所有阶段建筑及其构件图纸的绘制都是改造工程的测量同时进行且密不可分的。

    youdao

  • The survey by the British Nationwide Building Society, moreover, shows the increase in the housing price in April reached 3.4%.

    英国全国建筑商协会调查显示4月份房价上涨幅度达到3.4%。

    youdao

  • Survey of goaf is a problem demanding prompt solution in the engineering building and production of coal mine.

    采空区探测工程建筑煤矿生产亟待解决问题

    youdao

  • This paper introduces a kind of the check method for the building pile position after coordinate survey layout.

    介绍建筑物工程桩坐标测量放线检查验线方法

    youdao

  • Construction control survey and construction moulding survey are the guarantee of that engineering building and the size of the details meet design.

    施工控制测量施工放样测量各项工程建筑物细部尺寸设计要求定位保证

    youdao

  • Through the analysis and summary of those survey results, appropriate energy-saving measurements are proposed for Ningbo rural residential building.

    通过调研结果分析总结提出适宜于宁波农村居住建筑的节能措施

    youdao

  • Through survey data, understanding Northeast Normal University of Humanities building of the contingent of teachers of the status.

    通过调查数据了解东北师范大学人文学院教师队伍建设现状。

    youdao

  • Commercial building energy consumption survey (CBECS) is a large survey towards the energy consumption and energy-related characteristics of the commercial buildings in the USA.

    美国商用建筑物能耗调研针对美国商用建筑物能耗情况、能源使用特性进行一个大型调研活动。

    youdao

  • The message is sinking in: a 2008 survey by Johnson Controls found that 72% of building managers are now paying attention to energy efficiency, up 10% from the year before.

    消息由江森控制2008年调查发现中被沉没,72%的基金经理建设现在注重能源效率,并年前增加了10%。

    youdao

  • Survey is very important for building construction. Establishment of the suitable control net and choice of the proper methods of survey can get quick and accurate survey.

    测量建筑施工非常重要工作,建立合适控制选择合适的放样方法,使测量快速准确

    youdao

  • The prize was awarded based on a survey of building industry companies.

    奖项的评选是基于建筑行业各大企业调查结果

    youdao

  • Survey and statistic of floor live load of residential building in Central Plains region;

    旨在提供不同使用年限建筑结构对应荷载水平。

    youdao

  • The transforming of survey datum and the control of axis, vertical level, elevation are of great importance on controlling quality of high-rise building construction.

    高层及超高层建筑工程测量基准传递轴线垂直高程控制建筑物施工质量控制重点内容之一。

    youdao

  • Therefore, studies one kind to suit in the large-scale bridge building construction high accuracy control surveys and constructs the survey method to be extremely essential.

    为此研究适合大型桥梁工程建设的高精度控制测量施工测量方法非常必要

    youdao

  • The process flow of building a spatial database is very vital to the general technical process of the digital geological survey system.

    空间数据库流程数字地质调查系统总体技术流程一个重要组成部分

    youdao

  • The general procedure of building up an urban survey information system is presented, several points should be paid attention to in the procedure.

    本文根据城市勘测信息系统特点,介绍了城市勘测信息系统建立一般过程,以及系统建立过程注意一些问题

    youdao

  • At the further deepening of the network economy today, the building of an efficient, convenient, and safe online survey sites are very necessary.

    网络经济进一步深化今天建设一个高效便利安全在线调查站点十分必要的

    youdao

  • The amount of drilling data available for building velocity models in a large area appears always too small to extend the velocities in well locations to the whole survey area.

    钻井资料海量地震数据相比总是显得太少区域速度建立必须借助数学插值方式 ,把井点速度外推全区

    youdao

  • The amount of drilling data available for building velocity models in a large area appears always too small to extend the velocities in well locations to the whole survey area.

    钻井资料海量地震数据相比总是显得太少区域速度建立必须借助数学插值方式 ,把井点速度外推全区

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定