The project, aimed at building support facilities for the Hainan International Conference and Exposition Center, has passed the ocean environmental impact evaluation.
该工程是海南国际会展中心的配套项目之一,已经通过海洋环境影响评估。
Upon completion of construction, he must submit a project description outlining the LEED design features incorporated into the building for formal USGBC evaluation.
工程完工后,业主必须提交有关工程采用LEED设计要求的概况描述并申请美国绿色建筑委员会(usgbc)进行评估。
This paper studies the application of FHW in high-tech project evaluation, including building the index set and evaluation matrix of FHW. Satisfactory results are obtained froth an example.
本文探讨FHW法在高新技术项目评价中的应用,包括指标的确定,FHW评价矩阵的建立,所得结果是令人满意的。
In reconstruction project of existing building, management planning of green construction mainly includes organization planning, program planning, target control and management evaluation.
在既有建筑改造项目中,绿色施工管理策划主要包括组织策划、方案策划、目标控制和评价管理等。
Using the result of this evaluation, the safe situation and the safety management level of the whole engineering project can be all-round controlled in the building site.
利用这一评价结果,可以全面掌控整个工程项目施工现场的安全状况和安全管理水平。
The thesis also carries on the quality synthetic evaluation to the amiable company China NAT 'l resources building project existence risk.
本文还对怡和公司华润大厦项目存在的风险进行综合评价。
This paper introduces the engineering geological evaluation of a project site of tall building flock in Chongqing city.
本文介绍了重庆某高层建筑群场地的工程地质评价。
Therefore, objective deviations are analyzed from the visual angle of CIT educational-experimental building project design scheme evaluation firstly;
文章从常州工学院教学实验楼设计方案评审的角度,分析了项目各方存在目标差异的原因;
Therefore, objective deviations are analyzed from the visual angle of CIT educational-experimental building project design scheme evaluation firstly;
文章从常州工学院教学实验楼设计方案评审的角度,分析了项目各方存在目标差异的原因;
应用推荐