• Before we talk about manifesting, before we build some new building or structure, get the foundation first.

    我们讨论之前,在我们建设任何新的建筑结构之前,打好基础

    youdao

  • Abstract: : the structure of the building is building the foundation of safety.

    摘要建筑结构建筑物安全基础

    youdao

  • The anchor bolting has been widely applied in supporting structure of deep foundation pit in high building, and it maintains safety of protection structure with soil layer fixed pressure.

    锚杆广泛应用于高层建筑基坑支护结构利用地层的锚固力维持结构的稳定。

    youdao

  • The non-uniformity settlement of ground foundation is harmful to the building, specially to the masonry structure and the concrete frame structure.

    地基基础不均匀沉降建筑物特别是混合结构房屋混凝土框架结构房屋产生很大的危害

    youdao

  • The method established the biological foundation for building quantitative structure-activity relationship (QSAR) model.

    方法建立定量构效关系(QSAR)模型奠定生物学检测基础

    youdao

  • The big physical volume concrete mainly uses in the big dam and responds a body, the foundation scaleboard of high building deep and large equipments foundation structure.

    体积混凝土主要大坝反应堆、高层建筑基础底板以及大型设备基础结构

    youdao

  • I believe that when learning spoken English you should view it as building a house: first you begin with the foundation, then you make the structure, finally you decorate the rooms.

    相信暑假英语辅导班的过程,如同修建套房子首先打好基础然后好基本结构最后装饰屋子。

    youdao

  • Considered as the branch system of building structure foundation engineering and analyses according to given-force structure, i. e. the concept design.

    作为房屋结构体系基础工程按照予力结构进行分析概念设计。

    youdao

  • It is the first time that large-area manually excavated piles were applied as the foundation of? Structure? In ship-building berth project.

    船台工程上大面积使用人工挖孔作为结构基础国内尚属首次

    youdao

  • This paper primarily discussed the design method of foundation of main floor and annex in the high layer building, and its structure does not establish to.

    本文主要论述高层建筑中不设沉降缝而对高层主体房之间进行设计构造处理。

    youdao

  • The underground pit wall structure unstability or foundation pit excavations accident will cause multi -pile(group- pile) serious movements when high- rise building built on soft ground.

    土地基上建造的高层建筑,有时因地下围护结构基坑挖土方法的不当造成基础发生严重位移的工程事故

    youdao

  • The present paper discusses the effect of soil pile-structure interaction on high building with pile foundation and the effect of nonlinear behavior of soil on structural seismic response.

    本文主要研究-结构相互作用对于基础高层建筑结构动力特性及其地震反应影响以及土的非线性性质对于土-桩-结构相互作用体系的地震反应的影响。

    youdao

  • Based on a project structure designing, the author introduces the option of the building foundation scheme, the dynamic properties analysis of the upper structure and the relevant structural measures.

    结合工程设计着重介绍建筑地基基础方案上部结构动力特性分析相应构造措施。

    youdao

  • Artificial pile foundation set into rock, skirt building with prestress plane floor and tower building with steel reinforced concrete (SRC) structure are adopted in the project.

    工程基础采用人工孔嵌灌注桩,采用预应力平板楼盖,塔楼采用混凝土结构

    youdao

  • The building with frame structure is based on manual cavity expansion pile foundation.

    该楼框架结构采用人工挖孔底桩基础。

    youdao

  • The building with frame structure is based on manual cavity expansion pile foundation.

    该楼框架结构采用人工挖孔底桩基础。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定