By analyzing the cause of bridge jump, the paper proposed relative protective measures.
通过对桥头跳车产生原因的分析,进一步提出产生桥头跳车的相应防治对策。
The paper analyzed the cause of bridge jump and proposed relative measures to avoid and reduce the bridge jump.
针对桥头跳车的情况分析其原因,提出预防及处理措施,以达到尽量避免或减少桥头跳车的情况。
At first the mechanism of bump at the bridge ends was analyzed, and the paper find main factor to cause bridge jump, and provide a method to cure bridge jump.
首先从理论上定性分析桥头跳车的作用机理及演变过程,从而找到导致桥头跳车的主要因素,最后结合实践提出了根治桥头跳车的方法。
If you can't jump over the stream, you'll have to go round by the bridge.
你如果不能跳过这条小河,就必须绕道从桥上过去。
I dared him to jump from the bridge into the river.
我用激将法要他从桥上跳入水中。
Whenever the bridge opened, the car appeared to jump over to the other side.
每当大桥开通,车子似乎跳跃到另一边。
Carl's friends defied him to jump into the river from the bridge.
卡尔的朋友们激他从桥上跳到河里去。
He dared me to jump from the bridge into the river.
他挑激我,说我不敢自桥上跳下河。
Somebody dared me to jump off the bridge into the river.
有人激我敢不敢从桥上跳进河里。
I dare you to jump from the bridge into the river.
我谅你也不敢从桥上跳下河。
This year was going to be the ultimate thrill. She was going to bungee jump from a bridge over 150 stories high!
今年她要向兴奋的极限挑战,因为她要去玩从150层楼高的桥往下坠落的高空弹跳!
All the members climb to a broken bridge with 8 meters height, jump from this end to the other end and return.
所有成员将爬上一个8米高的断桥,从一端跳到另一端并返回。
Follow the staffs'directions, and get into or out of Glass Bridge in a queue. Do not crowd or jump the queue. Wait patiently when the lock gate is closed to prevent overload.
听从工作人员指挥排队上下桥,不得拥挤、争抢,桥上达到荷载人数关闭闸门时,不得强行闯关。
And then, in 1988, after working with scientists to develop a safe, professional-grade rope, bungee legend AJ Hackett opened the first commercial bungee jump site on Kawarau Bridge in New Zealand.
之后,在1988年,蹦极之父阿伦•约翰•哈克特与科学家共同开发一种安全专业的级绳,并在新西兰卡瓦劳大桥开通第一个商业蹦极网站。
This paper introduces a successful application of the composite foundation with low-strength-concrete pile and cement-mixed pile in Ouhai road of Wenzhou to alleviate bridge-head jump.
介绍了温州瓯海大道桥头路堤采用低强度砼桩和水泥搅拌桩组合复合地基处理桥头跳车问题。
This paper introduces a successful application of the composite foundation with low-strength-concrete pile and cement-mixed pile in Ouhai road of Wenzhou to alleviate bridge-head jump.
介绍了温州瓯海大道桥头路堤采用低强度砼桩和水泥搅拌桩组合复合地基处理桥头跳车问题。
应用推荐