• The big change of the vehicle load in the new code of bridge design brings about some changes in the calculation of the large cantilever deck.

    新的桥梁设计规范汽车荷载较大改变使得长悬臂行车道板计算有所变化

    youdao

  • In addition, the test can improve directly the theory of wind resistance design to bridge and improve the code of wind resistance design.

    此外风洞试验还能为桥梁设计理论规范改进提供直接有效的依据

    youdao

  • The design approach in new published criteria for seismic design of bridge is comparative in some aspect with abroad code, but more improvement is necessary.

    颁布桥梁抗震设计细则设计方法国外桥梁抗震设计方法已经比较接近,需要进一步改进。

    youdao

  • All behavior and side constraints specified in the AASHTO bridge code are considered in the optimum design process.

    最优设计桥梁的性态约束几何约束是根据AASHTO来确定的。

    youdao

  • The result show that: under the design load the maximum deflection and stress is less than code values, the bridge is safety.

    计算结果表明:该桥在设计荷载最大挠度应力小于规范规定值,结构处于安全的范围内。

    youdao

  • According to China's design code for road construction, the general height limit for vehicles is 4.5 meters, while the under-bridge height limit on main roads is 4.2 meters.

    根据中国道路建设设计规则车辆总体4.5主干道上的桥下限高则4.2米。

    youdao

  • According to China's design code for road construction, the general height limit for vehicles is 4.5 meters, while the under-bridge height limit on main roads is 4.2 meters.

    根据中国道路建设设计规则车辆总体4.5主干道上的桥下限高则4.2米。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定