• This paper presents the authors' viewpoint on the choice of minimum reinforcement for isolated foundation bottom slab.

    本文对选择隔振基础底板最小配筋量的问题提出了作者的观点。

    youdao

  • The Suggestions on the restoration of the bottom slab are also given.

    最后给出了此桥底板修复的若干建议。

    youdao

  • To speed up the bottom slab construction is the key point for controlling the deformation generally.

    加速底板施工是控制底板总变形量的关键。

    youdao

  • This paper presents the authors'viewpoint on the choice of minimum reinforcement for isolated foundation bottom slab.

    对扩展基础底板配筋计算是否要验算最小配筋率的问题提出了自己的观点。

    youdao

  • Analyze the loading of the bottom slab of sluice in the way of elastic grade beam as well as points out the problems in the design program.

    采用弹性地基梁的方法,对流槽底板进行了受力分析,并指出以此法进行设计计算时存在的问题。

    youdao

  • In the stability design of the bottom slab of stilling basin or water cushion pool for a long time past, a little attention was paid to the pulse load on the slab.

    以往在消力池或水垫塘底板的稳定性设计中,很少注意板块上脉动荷载的作用。

    youdao

  • It is one of the defects that cracks occur in the bottom slab of an extra-long prestressed concrete continuous rigid frame bridge. There are many influence factors.

    大跨度预应力混凝土连续刚构桥底板出现开裂是该类桥梁出现的问题之一,其影响因素较多。

    youdao

  • It is one of the defects that cracks occur in the bottom slab of an extra-long prestressed concrete continuous rigid frame bridge. There are many influence factors.

    大跨度预应力混凝土连续刚构桥底板出现开裂是该类桥梁出现的问题之一,其影响因素较多。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定