The foundation of the pylon is composed of bored piles and separate pile caps connected with prestressed concrete tie beams.
主塔基础采用分离式承台钻孔桩基础,两承台设横系梁连接,系梁为预应力混凝土结构。
The foundation of the pylon is composed of bored piles and separate pile caps connected with prestressed concrete tie beams.
主塔基础采用分离式承台钻孔桩基础,两承台设横系梁连接,系梁为预应力混凝土结构。
应用推荐