• Load, boom Angle, and other indicators over their full range, for any significant inaccuracies.

    由于任何明显误差负荷、吊其它指示超过最大范围

    youdao

  • Operator controls stay up on the end of the boom, with the load being placed.

    放置载荷状态下,操作者重臂端部进行整夜控制

    youdao

  • The influence of load hoisting acceleration on dynamic forces is obvious, especially on dynamic bending moment of the main boom.

    结论重起升加速度起重机动载荷影响较大特别臂内弯矩的激励更加明显。

    youdao

  • It also analyzes stress condition of two important components of the device, dipper handle and boom, supplying load basis for subsequent static analysis.

    分析机构两个重要部件动臂受力状况后续静力学分析提供荷载依据

    youdao

  • Present paper takes a tubular boom as an example to prove that it is precise enough to use energy method to find buckling load of a boom.

    本文管形变截面证明能量臂架屈曲载荷相当准确

    youdao

  • Model RT550 wheel type off-road crane; Load carry and travel; Boom telescoping with load; Lift operation;

    RT550越野轮胎起重机; 吊运行驶; 带伸缩; 起重作业;

    youdao

  • Through the modal analysis, it is found that main vibration modes of floating crane structure are swing of rope-load system and vibration of boom, and the vibration frequencies are low;

    通过分析发现浮吊结构主要表现为主钩钢丝绳-吊重系统摆动振动,振动频率很低;

    youdao

  • Through the modal analysis, it is found that main vibration modes of floating crane structure are swing of rope-load system and vibration of boom, and the vibration frequencies are low;

    通过分析发现浮吊结构主要表现为主钩钢丝绳-吊重系统摆动振动,振动频率很低;

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定