Bonding quality testing of the second interface of well cementation is a difficult problem in oil log-ging.
检测第二界面的固井质量是当今石油测井中的一项技术难题。
It is difficult to guarantee the quality by earlier checking, so the wire bonding is one of the key factors affecting the SAW filter's performance and reliability.
由于内连质量很难通过中间过程的检测完全确定,因此,内连技术成为影响SAW器件性能和可靠性的关键之一。
Silicon glue, silica gel and metal bonding agent, rubber adhesive, rubber treatment agent, silicone agents, all kinds of seal adhesive and difficult to stick adhesive materials, coupling age.
硅胶胶水、硅胶与金属粘接剂、橡胶粘接剂、橡胶处理剂、矽胶处理剂、各类密封粘接剂、难粘材料粘接剂、偶联剂、处理剂。
The mainly difficult problem of production inadequate return top of slurry and poor bonding cementing hole reaction are discussed in the paper;
论述了长庆油田固井过程中存在的主要生产难题—水泥返高不足和注水泥井段胶结质量不理想;
The mainly difficult problem of production inadequate return top of slurry and poor bonding cementing hole reaction are discussed in the paper;
论述了长庆油田固井过程中存在的主要生产难题—水泥返高不足和注水泥井段胶结质量不理想;
应用推荐