• Contact problems between concrete base surface and column base, bolt nut and neighborhood plate, bolt shank and bolt hole are simulated really.

    有限元分析中模拟底板基础之间垫片底板之间、以及锚栓与混凝土之间的接触作用

    youdao

  • Drill two tunnels at the PCL attachment point inside the thighbone, intersecting with the reconstructed 1igament from the two tunnels behind the shank, fixing the free end using the absorb bolt.

    股骨PCL附着点处分别钻取前后隧道内外两隧道引出重建韧带形成交叉游离使用可吸收螺钉固定。

    youdao

  • Drill two tunnels at the PCL attachment point inside the thighbone, intersecting with the reconstructed 1igament from the two tunnels behind the shank, fixing the free end using the absorb bolt.

    股骨PCL附着点处分别钻取前后隧道内外两隧道引出重建韧带形成交叉游离使用可吸收螺钉固定。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定