• The sample enters the boiler unit.

    试样进入蒸发器

    youdao

  • The sample enters the boiler unit .

    试样进入蒸发器

    youdao

  • The feed water pump of boiler is one of important equipment of boiler unit. The invalidation of it will bring large economic loss.

    水泵电站单元机组重要设备之一失效带来巨大经济损失

    youdao

  • The expansion gases from the gas liquor separation unit were originally sent to the flare system, but are now recycled as fuel for the boiler unit.

    分离装置分离出的闪蒸气原先送到火炬系统现在作为燃烧气返回锅炉机组

    youdao

  • Two controlled circulation boilers were installed in Dagang Power Plant technique updating engineering. Chemical cleaning was achieved before start of the boiler unit.

    大港发电厂技改工程安装台强制循环汽包锅炉机组启动进行化学清洗

    youdao

  • In a steam power plant, after enhancement of process control and administration, medium-loss at boiler unit is obviously reduced; scar-removing ratio is reduced from 6.

    某公司热电厂通过加强过程控制管理降低锅炉站内工质损失,锅炉排污改造前的6

    youdao

  • Discharge controlling and cooling of the bottom ash is one of the main problems faced by CFB boiler unit, which will associate with the safe and stable operation of unit in large.

    排放控制冷却目前困扰CF B电厂的突出问题,直接影响到整个机组安全稳定运行

    youdao

  • Should there be any trouble with the boiler, the automatic controlling unit would cut off the fuel oil supply.

    假如锅炉出问题的话自控装置自动切断燃油的供给。

    youdao

  • NJU automatic controllers used for the preheating boiler and converter unit of diesel locomotive are developed for the replacement of the similar equipment in V_(1003) and V_(100) diesel locomotives.

    NJU机车预热锅炉自控器变流机组自控器取代V_(1003)和V_(100)型机车同类装置研制

    youdao

  • By analyzing the material choosing of boiler for supercritical Unit, candidate materials of supercritical water cooled reactor were been put forward in this paper.

    本文分析超临界火电站锅炉用材基础上,提出选择超临界水冷堆芯材料的建议。

    youdao

  • The coal quality and type not only affect the boiler combustion, unit operation, and energy consumption for power generation in power plants, but also has direct relation with the coal handing system.

    煤质的好坏不仅影响锅炉燃烧工况调整机组安全运行电厂发电能耗而且煤质和煤种变化对输系统直接关系

    youdao

  • This unit mainly supplies fuel gas for the equipment like in-plant boiler house heater in dehydration unit main combustion furnace in sour gas treatment unit tail gas incinerator and flare stack etc.

    单元主要厂内锅炉房脱水装置加热炉、处理装置燃烧尾气灼烧炉以及放空火炬等燃气设备提供燃料气。

    youdao

  • The transformations of tiny-oil ignition and stable combustion technology were started for meet low load stable combustion on Shaoguan Power Plant Unit 10 "W"-type boiler.

    为了满足韶关电厂10号机组W锅炉负荷,开展了点火稳燃技术改造

    youdao

  • Coordinate equilibrium cooperation among boiler water, coal, wind, cigarette and electricity, realize the security, economy, optimize controlling of the unit.

    协调锅炉之间平衡配合实现机组的安全经济优化控制

    youdao

  • The boiler MFT (master fuel trip) protection was actuated during start up of feed water pump A of Unit 1 and 2 in Huaneng Shantou Power Plant.

    华能汕头发电厂1号2机组发生启动水泵锅炉燃料跳闸MFT事故。

    youdao

  • The once-through boiler of large capacity and high parameters is a very complex unit to be controlled.

    容量参数直流锅炉单元机组一个十分复杂调节对象。

    youdao

  • While the controller is applied to controlling system about unit load of boiler, adaptive control of nonlinear big-lagged system is realized.

    控制器应用锅炉单元机组负荷控制系统中,实现了非线性和大时滞系统的自适应控制

    youdao

  • The reheating turbine and boiler are operated as single unit, so the turbine speed-power control system must be adjusted in accordance with the dynamic characteristic of the whole unit.

    汽轮机已同锅炉组成单元机组运行因此必须根据单元机组整体动态特性来整定汽轮机功频调节系统

    youdao

  • As to piping-main scheme unit, boiler piping-main steam pressure is the important parameter of signifying the running state of the boiler.

    对于管制运行机组,母管蒸汽压力表征锅炉运行状态重要参数

    youdao

  • This paper introduced the condition of using layered charge coal unit for boiler and energy saving effects gained in Baoji Nonferrous Metals Processing Plant.

    本文介绍宝鸡有色金属加工厂锅炉上应用分层装置情况取得节能效果

    youdao

  • With this type of burner, the boiler efficiency of 300mw unit has reached over 93%, while the excess air ratio after economizer is reduced to 1. 15.

    燃烧器300MW机组锅炉热效率达到93%以上,煤器过剩空气系数可降至1.15。

    youdao

  • This article, to the Meng Da power plant 330MW unit, develops one et of complete power station boiler heating surface dust stratification and slag-bonding monitoring system.

    本文针对内蒙达旗电厂330MW机组开发了完整电站锅炉受热面结渣积灰监测系统

    youdao

  • The design of the co combustor in the revamp of waste heat boiler of FCC unit of a refinery was modified based upon the commercial operation experience.

    介绍了炼油厂催化裂化装置余热锅炉技术改造CO燃烧设计改进情况。

    youdao

  • To discover the minor leakage in boiler on time is significant to avoid unscheduled downtime of power unit and minimize maintenance period.

    及早发现锅炉轻微泄漏避免机组非计划停运、缩短检修时间具有非常积极的意义。

    youdao

  • This paper briefly describes the design's requirements of circulating fluidized bed unit, and the structure performance of the boiler.

    介绍循环流化床机组设计要求锅炉的结构特性

    youdao

  • Aiming at the problems of interlock circuit complex and faults frequent of the origin boiler soot blowing control system for 300mw generation unit, elaborates the necessity of improvement.

    针对300MW火力发电机组锅炉吹灰控制系统存在联锁回路复杂故障频繁等问题,阐述了对系统进行改进必要性

    youdao

  • The operation of load distribution of boiler and turbine as well as the principle for coordinated control for thermal power generation unit with header are expounded.

    论述了母管制热电机组锅炉、汽机负荷分配运算协调控制原理

    youdao

  • The operation of load distribution of boiler and turbine as well as the principle for coordinated control for thermal power generation unit with header are expounded.

    论述了母管制热电机组锅炉、汽机负荷分配运算协调控制原理

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定