Programmed control system shall be applied to blowdown system to enhance automation level of boiler's operation.
排污系统拟采用程控系统,以提高锅炉运行的自动化水平。
Based on the equivalent heat-drop method, the paper presents optimum design process of blowdown system in 200 MW generation unit.
利用等效焓降法对200MW机组排污扩容器系统进行了优化设计。
In view of the existing problems in the continuous blowdown system of 300MW boiler, the optimal refurbishment is carried out to save energy.
针对铁岭电厂300MW机组锅炉连续排污系统存在的问题,从节能的角度出发,对连续排系统进行了优化改造。
In view of the existing problems in the continuous blowdown system of 300MW boiler, the optimal refurbishment is carried out to save energy.
针对铁岭电厂300MW机组锅炉连续排污系统存在的问题,从节能的角度出发,对连续排系统进行了优化改造。
应用推荐