• An analysis of why the bleeding check valve of a 600 MW steam turbine-generator set couldn't readily shut during testing is being presented, together with means of improvement.

    对进口某型号600MW汽轮发电机组进行试验时出现抽汽逆止关闭到位现象进行分析,并提出了改进措施。

    youdao

  • The testing method of acquiring the data guide lines is based on provision of GB8076-1997 including bleeding rate, slump, concreting time. ratio of compressive strength. shrinkage rate and so on.

    获得数据指标试验方法根据GB8076- 1997规定试验方法,包括:泌水坍落度凝结时间差、压强度收缩率等。

    youdao

  • The testing method of acquiring the data guide lines is based on provision of GB8076-1997 including bleeding rate, slump, concreting time. ratio of compressive strength. shrinkage rate and so on.

    获得数据指标试验方法根据GB8076- 1997规定试验方法,包括:泌水坍落度凝结时间差、压强度收缩率等。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定