It is of great importance to the effect of sintering ore strength on blast furnace operation.
烧结矿强度对高炉冶炼的影响至关重要。
The influence of coke quality on blast furnace operation and the requests of coke quality are introduced.
介绍了焦炭质量变化对高炉操作的影响以及大高炉生产对焦炭质量的要求。
The intensification of blast furnace operation is based on quality raw materials and smooth running are put forward.
精料是高炉强化的基础,顺行是高炉强化的前提。
All the above-mentioned models have run over one year and played an important role in improving blast furnace operation.
以上模型已在线运行一年多,对改善高炉操作发挥了重要作用。
Because of high alkaline earth metal content, the reduction swelling of Baotou pellet makes blast furnace operation very difficult.
包头白云鄂博矿碱金属含量高,球团还原膨胀率高,给高炉冶炼带来很大困难。
BF raceway is an indispensable part of the reaction area to the blast furnace operation, moreover the internal physical and chemical reaction is very complex.
高炉风口回旋区是高炉顺行不可缺少的重要反应区,而且回旋区内部的物理、化学反应十分复杂。
The coke quantity variety to the influence of the Blast furnace operation and the concrete request for coke quantity. in production of the big Blast furnace are Introduced.
介绍了焦炭质量变化对高炉操作的影响以及大高炉生产对焦炭质量的具体要求。
This paper describes the regularity of the blast furnace operation with the oxygen-enriched and PCI process. The theoretical relations between the PCI rate and oxygen-enrichment are analyzed.
本文描述了高炉高富氧喷煤操作的规律,分析了喷煤量与富氧率之间的关系。
The influence of type and structure parameters of cooler, kind of lining refractory, operation factors on the temperature field in the wall of blast furnace was investigated.
讨论了冷却器形式、冷却器的结构参数、耐火材料种类以及高炉操作等因素对炉墙温度场的影响。
Some detail problems existing in sinter, blast furnace pulverized coal injection and BF operation were summarized, and some motheds solving problems were introduced.
对烧结、高炉喷煤及高炉操作过程中在某些细节上存在的问题进行了分析,并介绍了相应的解决方法。
The blast furnace expert system developed by WISCO has been put into operation at No. 1 BF.
武钢等单位开发的高炉专家系统已在武钢1号高炉投入生产运行。
The relationships between smelting in FeMn blast furnace and coke rate, raw materials, fuel properties, operation and blast furnace type are stated.
论述了锰铁高炉冶炼强度与焦比、原燃料性能、高炉操作、高炉炉型等关系。
In order to improve smelting coefficient of blast furnace, produce more molten iron and decrease energy consumption, enterprise usually adopts furnace top high pressure operation.
为了提高高炉冶炼系数,多出铁,减少能源消耗,企业通常尽量采用炉顶高压操作。
The results indicate that the two factors, which are very important during operation of blast furnace and manufacturing of cooling stave, highly influence cooling capacity of cooling stave.
结果表明:这两个因素对冷却壁的性能都具有很大的影响,在高炉操作和冷却壁的设计制造中必须重视。
Unstable operation or tacking for the axial fan of the blast furnace can cause accidents, which can be avoided by adjusting the Angle of the leading blade.
前言:高炉轴流风机处于不稳定工况区运行或出现“抢风”都会造成事故。
The measure or prediction of the status inside a blast-furnace is the basis of optimizing the burden-laying operation.
高炉炉内状态的检测、预测是高炉优化操作的基础。
The results indicated that the three factors affected the property of the cooling stave, therefore, much importance should be attached to the designing of stave and operation of blast furnace.
结果表明,这三个因素对冷却壁的性能都具有很大的影响,在冷却壁的设计和高炉操作中必须引起重视。
With using these pellets in blast furnace for making pig iron with higher manganese content the BF operation data improved and the recovery of manganese increased.
这种球团矿用于高炉冶炼含锰量较高的生铁,可以改善高炉冶炼技术经济指标和提高锰的回收率。
Skilled grasps the breakdown the diagnosis and removes the method, can guarantee the blast-furnace smelting the normal operation.
熟练掌握故障的诊断和排除方法,才能保证高炉冶炼的正常运行。
Some key problems in hot blast furnace design are analysis, such as operation reliability, strengthen heat transfer, expanding compensation and so on.
分析了热风炉设计中的工作可靠性、强化传热、膨胀补偿等关键问题。
The broken cooling plant leaked through the blast furnace, resulting in poor furnace condition and poor operation.
冷却设备破损向高炉内漏水,影响炉况及操作。
Highpressure and high temperature boiler of firing pure blast furnace gas has its own characters of construction and operation because of BFG special characters.
全燃高炉煤气的高温高压锅炉是根据高炉煤气特性设计制造的一种电站锅炉,在结构和运行上具有一定的特点。
For large blast furnaces, the change of main operation parameters are analyzed and gas channels in high temperature and lower part of blast furnace an discussed for three modes.
在大型高炉工况条件下,解析了3种富氧操作方式下主要冶炼参数的变化规律,以及高炉下部高温区煤气通道状况。
The system can monitor water temperature difference, flux and heat load of the BF. The operation result has shown that the system establish basis to blast furnace silent running.
采用该监测系统可实时监测高炉冷却系统的水温差、流量及热负荷,为高炉安全生产提供有力保障。
But the finished sinter powder content of less powerful of the blast furnace, cold back to mine to participate in ingredients, can be stable sintering operation.
但成品烧结矿粉末含量少,对高炉有力,冷返矿参加配料,可稳定烧结操作。
Blast furnace lining should be maintained during furnace operation and periodic repair.
高炉内衬应该在日常生产和定期检修中进行维护。
The objective is how to improve and maintain the flow-rate and temperature of the blast air to ensure efficient furnace operation.
如何保证热风炉产生持续高温是热风炉控制的目的。
The objective is how to improve and maintain the flow-rate and temperature of the blast air to ensure efficient furnace operation.
如何保证热风炉产生持续高温是热风炉控制的目的。
应用推荐