• The problems in buiding blast furnace stack has been analysed. Th plan of multiple-head spiral masonry hasBeen raised.

    分析了目前高炉砌砖存在的问题,提出多头螺旋,无错台砌筑方案

    youdao

  • The blast furnace 3, Meishan at the later phase of its campaign, with seriously eroded stack and mostly damaged cooling equipment, restrains the normal production of the blast furnace.

    梅山高炉处于后期,炉身侵蚀严重冷却设备大量损坏制约高炉正常生产

    youdao

  • The blast furnace 3, Meishan at the later phase of its campaign, with seriously eroded stack and mostly damaged cooling equipment, restrains the normal production of the blast furnace.

    梅山高炉处于后期,炉身侵蚀严重冷却设备大量损坏制约高炉正常生产

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定