Black start is important to power system safety. As an integrant part of black start, reasonable network reconfiguration is helpful to establish the main network and restore loads quickly.
电力系统全停电后的黑启动恢复问题是电力系统安全防御的重要课题,合理的网络重构策略对于快速建立输电网架、全面恢复负荷具有重要意义。
The system restoration is also called black start.
全停后的恢复通俗地可称为黑起动。
Hydropower stations, for their own features, are very suitable to function as a black start power source station. T…
文章结合水电站的特点重点讨论了在黑启动预案的制定时应该注意的几个问题。
This research aims to study over voltage induced by under-excitation limitation moves in black start of the power system.
对黑启动过程中发电机带空载长线路可能出现的欠励限制动作导致的系统工频电压升高问题进行了研究。
When a small system is in on-load operation in the early stage of black start, unit paralleling may fail due to reverse power protection.
黑启动初始阶段,小系统空载运行的情况下,由于逆功率保护而往往发生机组并车失败问题。
Whether the generator's self-excitation takes place during black start is a key factor for determining feasibility of restoration schemes.
黑启动过程中有可能发生的机组自励磁问题是决定黑启动恢复方案是否可行的关键因素之一。
This article describes how to realize black start scheme of Hunanzhen Hydropower Station, which is the black start source of the Wuxijiang power grid zone of Zhejiang.
本文叙述了湖南镇电站作为浙江电网乌溪江区域电网的黑启动源,其黑启动方案的研究及实现。
Black start - up is one of the important means for quick recovery of electric power system failure, and it can reduce the loss and meet the demand for emergency use.
黑启动是电力系统故障后迅速恢复的重要措施之一,可减少系统事故损失,满足系统紧急事故备用要求。
This paper discusses the method to make protection scheme for system black-start with the case of the first black-start test of Hubei power system.
文章以湖北电网首次黑启动试验为例,讨论制订黑启动过程的继电保护方案的思路和方法。
Based on data envelopment analysis, a new method for assessing black-start plans is proposed in this paper.
该文提出了一种基于数据包络分析模型的电力系统黑启动方案相对有效性的评估方法。
It proves that the isolated network control system is effective method to restore the fault of power grids, and to solve the problem of black-start.
证明了孤立电网控制系统是恢复电网故障、解决黑启动问题的有效途径。
With the deepening of research, the study on power system restoration has expanded from the black-start to skeleton restoration.
随着研究的深入,对电力系统恢复的研究已经由原来的黑启动阶段扩展到网架恢复阶段。
In order to raise the efficiency of making black-start scheme, the system provides powerful graphical man-machine interface.
为了提高黑启动方案制定的效率,系统提供功能强大的图形化人机界面。
Under the condition of total or partial power net breakdown, system recovery can be realized by black-start scheme, in which units with self-start ability are used to bring others to start up.
电网全部或部分因故障停运后,采用黑启动方案,通过系统中具有自启动能力的机组带动无自启动能力的机组,可实现整个电网的恢复。
Procedures and actual operation conditions of the black-start experiment in 2005 are described.
描述了该电厂2005年的具体试验过程及实时运行状况。
Procedures and actual operation conditions of the black-start experiment in 2005 are described.
描述了该电厂2005年的具体试验过程及实时运行状况。
应用推荐