In the absence of a feed-in tariff, wind power projects with more than 50mw of capacity need to undertake a public bidding process in which low tariffs are the primary criterion for winning.
在没有电网回购(feed - intariff)的情况下,拥有50兆瓦以上容量的风力发电项目需要进行公开招标,低电价成为中标的首要标准。
Also it is the valuation criterion of material price dynamic variation and basis of the material valuation for bidding bottom of construction bid and tender quotation.
同时,它也是材料价格动态变化的计价依据,施工招标标底、投标报价的材料费计价的基础。
Also it is the valuation criterion of material price dynamic variation and basis of the material valuation for bidding bottom of construction bid and tender quotation.
同时,它也是材料价格动态变化的计价依据,施工招标标底、投标报价的材料费计价的基础。
应用推荐