• The erosion depth in the hearth of No. 8 BF were determined before blow-down in it's 1st relining, and the salamander-taphole was positioned reasonably and the salamander as tapped successfully.

    宣钢8高炉第一代大修时,对炉底侵蚀深度进行了计算,确定铁口的位置,使停炉后放铁取得了成功

    youdao

  • The erosion depth in the hearth of No. 8 BF were determined before blow-down in it's 1st relining, and the salamander-taphole was positioned reasonably and the salamander as tapped successfully.

    宣钢8高炉第一代大修时,对炉底侵蚀深度进行了计算,确定铁口的位置,使停炉后放铁取得了成功

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定