If direct assessment in difficult, Benefit Transfer Method (BTM) is always used in evaluation process.
当直接评估存在困难时,成果参照法被经常采用。
Capacity benefit margin (CBM) is evaluated and optimized via an iterative method based on a presumed generation reliability level when the available transfer capability (ATC) is calculated.
目前在求解可用输电容量(atc)时,容量效益裕度(CBM)的评估是根据预先设定的某一发电可靠性水平多次计算可靠性,进行迭代优化。
Capacity benefit margin (CBM) is evaluated and optimized via an iterative method based on a presumed generation reliability level when the available transfer capability (ATC) is calculated.
目前在求解可用输电容量(atc)时,容量效益裕度(CBM)的评估是根据预先设定的某一发电可靠性水平多次计算可靠性,进行迭代优化。
应用推荐