In addition, the existing capacity also needs refurbishment because, as it stands today, a quarter of Africa's installed power generation capacity is not operational.
此外,需要对现有发电设备进行更新改造,因为目前非洲有四分之一的装机容量并未投入运营。
In addition, the existing capacity also needs refurbishment because, as it stands today, a quarter of Africa's installed power generation capacity is not operational.
此外,需要对现有发电设备进行更新改造,因为目前非洲有四分之一的装机容量并未投入运营。
应用推荐