• The prestressed steel bar is drawn when there is uniform temperature of the main beam body, so that the prestress loss can be decreased.

    在梁体温度均匀时张拉预应力钢束,可减少结构的预应力损失。

    youdao

  • This paper presents theoretical calculation method for lateral stability of beam body on rubber seat, based on the analysis of lateral stability of concrete simple-supported beam.

    本文在混凝土简支梁横向稳定性分析的基础上,提出了橡胶支座上梁体横向稳定性的理论计算方法。

    youdao

  • The side protecting plate of beam body and the beam body are fixedly connected.

    所述梁体侧护板和梁体固定联接;

    youdao

  • The whole equipment system consists of the guiding device, bearing device, signal device, piston cylinder device, beam body, hydraulic system and rotating lifting eye etc.

    整个设备系统由导向装置、支承装置、信号装置、柱塞缸装置、梁体、液压系统装置和中间旋转吊耳装置等部件组成。

    youdao

  • The whole equipment system consists of the guiding device, bearing device, signal device, piston cylinder device, beam body, hydraulic system and rotating lifting eye etc.

    整个设备系统由导向装置、支承装置、信号装置、柱塞缸装置、梁体、液压系统装置和中间旋转吊耳装置等部件组成。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定