More complex projects might have one or more levels of development streams originating from various baseline configurations of the integration stream.
更复杂的项目可能有一个和更多级别的开发流,它们始于集成流的不同基线配置。
A baseline is usually created at a significant phase or milestone of architecture development.
基线通常是在重要的阶段或者结构开发的关键时期创建的。
Data extraction accelerators can be re-used for baseline assessment and for development.
重复使用数据提取加速器以进行基准评估和开发。
The software development team continues working based on the baseline bl2 (branch rq_bl2).
软件开发团队继续在基线b12 的基础上工作(分组rq_bl2)。
The software development team starts working on baseline bl1 (branch rq_bl1).
软件开发团队的工作从处理基线b11(分组rq_bl1)开始。
After you create the baseline, the process starts again and repeats until the development work is complete.
在您创建基线之后,进程会再次启动和重复,直到开发工作完成之后。
Propagate project models into the development stream whenever a new baseline is recommended.a.
不论何时推荐新的基线时,发布项目模型到开发流程中。
If the software development team needs to clarify or detail requirements, they will make the changes directly on the baseline bl1 (main branch).
如果软件开发团队需要辨别以及将需求具体化,他们将会对基线b11(主要分组)直接做出改变。
The bioassay method of baseline sensitivity was developed on the basis of the effect of enostrobilurin on Pseudoperonospora cubensis at different development stages during its life cycle.
研究黄瓜霜霉病菌不同发育阶段对烯肟菌酯的敏感性,明确建立敏感性基线的生物测定方法。
The scenario of socioeconomic development indicates that, compared to the baseline period, the future demand for water resources in the Yellow River Basin will increase by 2.5% ~ 21.4%.
经济社会发展情景显示,未来黄河流域水资源需求量相比于基准期的增幅在2.5% ~ 21.4%之间。
After you establish a baseline state for your database, you perform iterative development tasks such as defining and updating database objects.
建立资料库的基准状态之后,您就可以执行反复开发工作,例如定义和更新资料库物件。
The development stream might be able to modify the component at the baseline it is configured with if the baseline is contained in its parent stream for this component.
开发流能编辑它基线搭配的构件,万一这个构件的基线被他父流包括。
During the 8-year follow-up study, Dr. Choi and colleagues assessed the development of neurodegenerative disease in patients with RBD at baseline.
在8年的随访研究中,Choi博士及其同事们评估了基线RBD患者神经退行性疾病的发生。
Schedule development can require the review and revision of duration estimates and resource estimates to create an approved project schedule that can serve as a baseline to (75) progress.
制订进度过程要求对历时估算和资源估算进行评审和修订,从而产生一个经过认可的项目进度作为对项目进展进行追踪的基准。
Therefore, the margin of the maximum gas temperature, rotor speed and capability of HP compressor are required during the development of core engine and baseline aero-engine.
因此,在核心机及基本发动机研制中,既要有燃气温度和转速的储备,又要有高压压气机性能的储备。
Therefore, the margin of the maximum gas temperature, rotor speed and capability of HP compressor are required during the development of core engine and baseline aero-engine.
因此,在核心机及基本发动机研制中,既要有燃气温度和转速的储备,又要有高压压气机性能的储备。
应用推荐