• Low - temperature boronizing base was studied for card wires with nitrogen atmosphere as outer layer protection.

    针布齿条气氛外层保护低温渗硼的方法进行了研究。

    youdao

  • The infiltration protection wall of deepest of over 80 meters at Xiaolangdi dam is the key project to control infiltration in the sand and gravel layer at dam base.

    小浪底主坝防渗墙坝基砂砾石覆盖层渗流控制关键工程最深80多米

    youdao

  • The infiltration protection wall of deepest of over 80 meters at Xiaolangdi dam is the key project to control infiltration in the sand and gravel layer at dam base.

    小浪底主坝防渗墙坝基砂砾石覆盖层渗流控制关键工程最深80多米

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定