Baodian Coal Mine of Yangzhou Mining Group has reformed the decentralized power supply system by using AUTOCAD and network technology.
兖矿集团鲍店煤矿应用AUTOCAD、网络技术对分散的供电系统进行改造,实现了采区变电所电网状态及绝缘监测。
The main and auxiliary shafts in Baodian Coal mine are deformed and ruptured, threatening seriously on the mine safety and causing heavy economic losses.
鲍店煤矿主副井筒变形破裂,严重威胁矿井安全,经济损失巨大。
The technical reform and experiment situation of dense medium cyclone coal preparation process in Baodian coal preparation plant are introduced in this paper.
介绍了鲍店选煤厂重介旋流器选煤工艺的改造与试验情况。
Maximum and minimum pumpage and optimum operation of water supply area in Baodian mine area in different periods and in different conditions are studied by grey linear programming.
用灰色线性规划研究鲍店矿区水源地当前和未来不同时期不同情况下的最大开采量、至少开采量及其相应的最优运行方案。
Maximum and minimum pumpage and optimum operation of water supply area in Baodian mine area in different periods and in different conditions are studied by grey linear programming.
用灰色线性规划研究鲍店矿区水源地当前和未来不同时期不同情况下的最大开采量、至少开采量及其相应的最优运行方案。
应用推荐