• The supply of irrigation water to the downstream from the Huangfeng canal was cut off during construction of the right bank dam of Suzhi hydropower project.

    苏只水电站右岸坝体施工截断了黄丰渠下游灌溉供水,为了避免断需要采取临时供水措施解决下游灌溉用水问题。

    youdao

  • The bank has done this even though its advisors say the dam will cause hardship for the powerless and environmental destruction.

    尽管世界银行的顾问大坝弱势群体带来困难,破坏环境,但世界银行还是这样做了

    youdao

  • The World Bank loan will finance construction of Shihutang Complex comprised of sluice gates, a ship lock, a power station with an installed capacity of 120 MW, a dam and an access road.

    世界银行贷款资金用于建设石虎航电枢纽工程,包括闸门船闸电站大坝和进场道路。

    youdao

  • Thanks to a World Bank-funded dam project, the sea’s northern tip will be preserved.

    幸亏世界银行资助的一项水利枢纽工程咸海北端保留下来

    youdao

  • As a kind of common device, the stone cage net has not only played a better role in the environment of dam and river bank, but also played an important role in highway and railway.

    作为一种常见装置不仅仅堤坝河岸等环境当中发挥好的性能作用,更加在公路、铁路方面发挥了一定的作用。

    youdao

  • The shifting of the whole dam to right bank after dam grouting was caused by the temperature difference of the banks.

    大坝封拱之后、整体右岸移,成因分析认为系二岸温差所致,并将引起较大坝体应力。

    youdao

  • Xinhe river basin is located on the left bank of 2,3,4 group of Zaolin village, protected by Xinhe dam.

    新河流域位于枣林234北侧,受现有新河大坝保护,历史上记载多次爆发山洪。

    youdao

  • The TGPs third stage river closure is a key works for the early stage cofferdam supported power generation and guarantee of the successive construction of hydroelectric plant and dam at right bank.

    三峡工程第三截流工程确保实现初期围堰挡水发电同时修建右岸大坝电厂关键性工程。

    youdao

  • The Xiaoshan Hydropower Station consists of reinforced concrete face rockfill dam, bank spillway, diversion system and power house.

    小山水电站工程钢筋混凝土面板堆石坝、岸坡溢洪道、引水系统及发电厂房组成。

    youdao

  • The right bank of the earth dam of Fengshuping reservoir lies in lime rock area, the left bank in sandstone area.

    枫树坪水库土坝右岸是建石灰岩地区左岸砂岩地区。

    youdao

  • The left bank and riverbed water retaining dam of Kangyang hydropower station is a dam with inclined loam core.

    扬水电站左岸河床水坝壤土斜墙

    youdao

  • The Xiaolangdi Multipurpose Dam project is one of the largest project with biggest single loan from the world Bank, as well as a challenging project in the worldwide.

    小浪底水利枢纽中国利用世界银行贷款单项数额最大项目,它也是世界范围内具有挑战性的工程。

    youdao

  • Roller compacted concrete (RCC) will be used in section no. 6-no. 15 of the spillway dam, section no. 5 of the non - overflow dam near the left side bank and the left guide wall of Wan 'an Project.

    万安水电站二期主体工程溢流坝6 ~15坝段左岸溢流坝5坝段部分采用碾压混凝土筑坝技术。

    youdao

  • Mr Beaver led them across the dam and on to the right bank of the river and then along a very rough sort of path among the trees right down by the river-bank.

    海狸先生他们穿过堤坝,走右岸,然后到河岸下面树丛一条崎岖不平的小路上

    youdao

  • To avoid the Guiwu road being divagated, the right bank joint dam of the Jingnan WR pivotal project took some measures to shorten the joint dams length and decrease excavation.

    广西京南水利枢纽右岸接头避免公路改道采取缩短接头长度、减少开挖措施 ,使基建面置于风化强烈、工程地质条件差的岩体上。

    youdao

  • The Nuozhadu Hydropower Station is huge in project scale and complex in engineering geological conditions and has weak tectonic zones on the right bank of its dam site.

    扎渡水电站工程规模巨大、枢纽工程地质条件复杂,坝址右岸分布构造软弱岩带等。

    youdao

  • An observation on dam-heel crack for studying the abnormal sudden change of uplift pressure and seepage flow of blocks close to the round corner of right bank is also introduced.

    右岸转弯坝段压力流量陡涨陡落异常情况进行了坝开裂试验观测

    youdao

  • Through finite element method calculation, we analyse the stress and stability of the bank spillway concrete structure in bad conditions for the dam of Yanzhangxi (1) Water Power Station in Longquan.

    通过有限元计算分析龙泉市岩樟溪一级电站拦河坝最不利工况时对岸坡溢洪道结构应力稳定影响。

    youdao

  • Connection between dam, foundation, bank slopes and other structures has to be strengthened, and drainage and anti-filtering facilities have to be properly arranged to avoid accident mentioned above.

    加强地基岸坡其他建筑物连接合理布置排水反滤设施避免事故的发生。

    youdao

  • The concrete face rockfill dam of Hongjiadu Hydropower Station located in deep mountain gorge of karst district, its left bank is high bluff side.

    洪家渡面板堆石坝处于高山峡谷岩溶地区,左岸边坡陡峻

    youdao

  • Meanwhile, , in India, the World Bank has given the go ahead to the even more wrong headed Narmada Dam.

    与此同时印度世界银行已经贷款建造问题繁多纳尔黙达大坝

    youdao

  • The heightening left bank works of Danjiangkou project consists of earth rock dam and concrete dam section on left bank.

    丹江口大坝加高左岸工程主要由左岸土石坝段混凝土坝段组成。

    youdao

  • Meanwhile, in India, the World Bank has given the go ahead to the even more wrong headed Narmada Dam.

    与此同时世界银行已经贷款印度建造问题很多的纳尔马达大坝

    youdao

  • Meanwhile, in India, the World Bank has given the go ahead to the even more wrong headed Narmada Dam.

    与此同时世界银行已经贷款印度建造问题很多的纳尔马达大坝

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定