• This paper deals with the system design method of assembly flow line, including determination of the work element time and the balancing problem of the assembly line and buffer storage capacity, etc.

    本文论述流水装配生产线系统设计装配要素作业时间决定方法以及生产线平衡缓冲库等问题的系统设计方法。

    youdao

  • The operations or process level is the core level in any PC-based standards system, and it often offers side benefits such as manufacturing line balancing.

    操作加工层次任何基于计算机标准体系都处于核心层次,常常生产线平衡那样提供边际效益

    youdao

  • The operations or process level is the core level in any PC-based standards system, and it often offers side benefits such as manufacturing line balancing.

    操作加工层次任何基于计算机标准体系都处于核心层次,常常生产线平衡那样提供边际效益

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定