• It is an actual three-dimensional structure, backfilled with sediment.

    一个真实三维结构回填沉积物

    youdao

  • They can be backfilled with concrete or plastered on the inside to beef them up.

    它们可以回填混凝土灰泥里面牛肉他们

    youdao

  • Cement piles (diameter 600mm) are foreseen under slab and inside the backfilled river.

    地坪回填河道内采用直径600毫米的水泥搅拌桩

    youdao

  • The intertidal zone and the developable land can be backfilled for the project construction.

    滩涂、荒地全部都可以通过回填进行造地,用于承接项目建设。

    youdao

  • It has been shown that bentonite is not suitable for backfilled material lonely, and should be mixed with cement in unsaturated state.

    试验结果表明膨润土适合单独用于回填材料,需水泥配合并推荐使用非饱和态。

    youdao

  • Its a good idea to have someone stand in the filter while it is being backfilled to prevent it from shifting out of position on the base.

    一个主意有人主张过滤同时,正在回填防止出来立场基地

    youdao

  • How to make the backfilled soil of pipeline trench stabilized in an effective manner is a major concern for the normal operation of pipeline.

    如何采取有效手段保持管沟回填涉及管道正常运营问题

    youdao

  • Where ground water is encountered, it shall be kept below the pipe by means of pumping until the pipe has been satisfactorily tested and backfilled.

    地下水中遇到保持低于方式抽水直到管道得到令人满意的测试回填。

    youdao

  • Sand DAMS, which are constructed out of concrete barriers 1-5m high and backfilled with sand, were voted as the best idea from five different proposals.

    混凝土护栏建造1至5米回填成的5个不同方案中脱颖而出,最佳方案

    youdao

  • Stiffness variation of backfilled soil played a small role on superstructure response when the substratum was relative stiff and the box foundation embedment was shallow.

    置深度浅、下土层刚度较大,箱基周围回填属性结构反应影响不大

    youdao

  • Due to the stress of backfilled soil, the asphalt coating at 3:00-9:00 (clock position) is easily disbonding and the CP is shielded, which results in the pipe body corrosion.

    回填土壤应力作用下,管道在3∶00 ~ 9∶00时钟位置石油沥青防腐容易出现剥离屏蔽阴极保护,导致腐蚀。

    youdao

  • The dynamics finite element program LS-DYNA3D is employed to simulate the high-explosive explosion experiment in granite, which has a crooked tunnel that is backfilled with concrete stemming.

    采用显式动力学有限元程序LS-DYNA3D,对花岗岩介质带拐弯坑道回填堵塞的化爆试验进行数值模拟

    youdao

  • The dynamics finite element program LS-DYNA3D is employed to simulate the high-explosive explosion experiment in granite, which has a crooked tunnel that is backfilled with concrete stemming.

    采用显式动力学有限元程序LS-DYNA3D,对花岗岩介质带拐弯坑道回填堵塞的化爆试验进行数值模拟

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定