• To protect it, we had to backfill on it again.

    为了保护遗址,又遗址进行了回填

    youdao

  • The self-tuning mechanism will backfill if necessary.

    优化机制在必要时进行回填

    youdao

  • We backfill, kick some leaves around, drag over a small fallen tree.

    然后我们填回坑里,踢过来一些树叶在上面,又拖过来枯树。

    youdao

  • Added: You can craft Destroyed Stone to backfill holes while mining.

    补充可以采矿时将石头的石头填回填土

    youdao

  • A systematical study is made of the stability of backfill in blasting.

    爆破动载充填体稳定性进行系统研究

    youdao

  • At last, some Suggestions were raised for the concrete backfill mining.

    最后具体充填开采方法提出建议

    youdao

  • The backfill simulating system and its automatic control are introduced in the paper.

    本文充填模拟系统的组成及充填站自动控制系统进行了介绍

    youdao

  • The upward drift stoping with backfill is a mining method with a widespread use future.

    上向进路充填采矿法一种具有广阔应用前景的采矿方法

    youdao

  • The thing we need to do: dig a hole, place vegetable shoots, backfill the hole, watering.

    种菜土坑、放菜苗、盖浇水

    youdao

  • Site stripping, subgrade preparation, rough and finish grading, excavation, backfill and compaction.

    场地清表、地基处理、初平平、开挖回填压实

    youdao

  • You've got survivorship bias taking out bad records and then you've got backfill bias adding good records.

    生存偏差去掉了那些糟糕记录,回填误差加入了一些好的记录

    youdao

  • The BACKFILL algorithm is not efficient for the CPU utilization of job scheduling in parallel system.

    BACKFILL方法并行作业调度不能有效地利用CPU资源。

    youdao

  • To pipe installation is complete and experience the qualified, conducted only after backfill earthwork.

    待涵管道安装完成经验合格方可进行土方回填

    youdao

  • So the survivorship bias and the backfill bias would be much, much more of a problem in the hedge fund world.

    所以生存偏差回填偏差,对冲基金领域一个相当重大问题

    youdao

  • The squeezed transportation pump is specialized equipment used for transporting fill in backfill mining.

    充填料挤压输送一种用于矿山充填专用设备

    youdao

  • Now,more than 130 managers failed because, in addition to survivorship bias, there's something called backfill bias.

    其实失败经理人超过130位,因为除了生存偏差之外,还有称为回填偏差的影响

    youdao

  • Earth excavation and backfill is to have the appropriate security measures to strictly regulate the construction.

    土方开挖回填相应安全措施,要严格按规范施工。

    youdao

  • In this article, the supporting behavior of cemented backfill rib pillars under certain circumstances are discussed.

    本文论述胶结充填人工矿柱(壁)一定条件下承载作用。

    youdao

  • In power project construction in mountainous areas, many are concerned of gravel backfill soil slopes and treatments.

    山区发电工程建设工程许多项目涉及碎石回填土的边坡和地基问题。

    youdao

  • Looking at this particular group, he estimated survivorship bias to be 4.4% per year and backfill bias to be 7.3% per year.

    分析这个特定的样本,估算生存偏差每年达到4.4%,回填偏差每年达到7.3%。

    youdao

  • The evolution of backfill disrtribution systems for deep mines is examined with reference to South African gold mining experience.

    本文参照南非金矿开采经验,回顾了深井矿山填料输送系统演变过程

    youdao

  • This paper analyzes the reason why the effect of cohesive plain backfill foundation reinforced by dynamic compaction is not ideal.

    通过强夯施工工艺及施工过程总结,分析强夯法加固粘性填土地效果理想原因

    youdao

  • On the basis of the uniaxial SHPB experiments, the typical impact waves are obtained about the high water material solidifying backfill body.

    固结充填体单轴SHPB冲击实验基础上得出充填体的典型冲击波形

    youdao

  • Secondly, models with different backfill-material such as argil fly-ash concrete, soil, sand, grit and lime-stabilized soil were experimented.

    其次进行了粒粉煤灰混凝土、粘性、风积砂砾石灰几种材料的台背回填离心模型试验。

    youdao

  • The indoor experiment on the filling materials used for downward slicing drift mining with cemented backfill in Gaolong Gold Mine was performed.

    对高龙金矿下向分层胶结充填采矿所用充填材料进行了室内试验研究。

    youdao

  • Lime-fly ash loess, composed of fly ash, lime and loess, is a new material in subgrade backfill to take the place of the (traditional) lime soil.

    黄土利用石灰粉煤灰土料混合作为回填土一种新型材料用以代替传统灰土或素填土。

    youdao

  • During the pipeline construction in backfill soil area it is needful to treat backfill soil around pipeline according to property of backfill soil.

    回填地区进行管道施工根据回填土性质,对管底及管顶的回填土进行处理

    youdao

  • On the basis of the design and surrounding conditions, the schemes of backfill soil foundation are discussed, and a reasonable method is determined.

    根据设计条件、周围环境、土地基处理方案进行了对比分析,确定合理的地基处理方案。

    youdao

  • On the basis of the design and surrounding conditions, the schemes of backfill soil foundation are discussed, and a reasonable method is determined.

    根据设计条件、周围环境、土地基处理方案进行了对比分析,确定合理的地基处理方案。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定