• Through analysis, an actual discharge process line method should be adopted to calculate calculating average discharge per diem.

    分析采用实测流量过程线推算平均流量,推算成果满足《规范》规定的精度要求。

    youdao

  • The size of feeding material is 450-1000mm, and the average discharge size is5-8mm, which is controlled effectively by multi-mode elastic adjusting mechanism.

    进料粒度达为450~1000mm,平均出料粒度小于或等于5~8mm。多方式弹性调节机构,有效控制了出料度;

    youdao

  • According to the application of average discharge a year and time rank at Tongmeng Station of Nen River, it shows that we are satisfied with the model and forecast precision.

    通过嫩江同盟平均流量时间序列应用表明,该模型预报精度满足要求。

    youdao

  • In this paper the nonlinear features of flood waves are discussed, the concepts of generalized average discharge and water-stage are given, and a new discharge-stage formula is derived.

    本文研究非线性洪水运动特性,提出了广义示储流量储水概念,得出了河段水位流量转换关系。

    youdao

  • Waveform, working voltage, average discharge current and polarity are automatically transformed by the microcomputer, and thus the hard - wares are decreased. The block diagram of softwares is given.

    采用微型计算机,使脉冲波形转换加工电压、加工电流、加工(?)性均由计算机自动切换、减少了硬件,给出了软件框图

    youdao

  • Average density and density distribution of electron and resonance Xenon are presented to study the process of discharge.

    研究了放电过程中各单元内电子、氙谐振态浓度分布平均浓度随时间变化情况。

    youdao

  • Results:A changed first discharge diagnosis leads the corresponding changes of average inpatient day of single disease and average medical cost.

    结果出院第一诊断改变导致病种平均住院日、平均医疗费用发生了相应变化

    youdao

  • Methods65 injured workers joined a 2.8-month (on average) training program by applying the BTE PRIMUS work simulated training system, with six-month follow up period after discharge.

    方法应用BTE PRIMUS职业模拟系统65名工伤职工进行平均2.8个月的职业模拟训练,出院对再就业情况跟踪调查6个月。

    youdao

  • Calculates average battery discharge rate over time.

    随着时间的推移,平均计算电池放电

    youdao

  • Ultrasonic liquid level gauge used to real-time measure the upper level and tail level of the two sections , then the computer calculated average water level, gradient of water table and discharge;

    用超声波液位计将测流渠上下游断面水位实时测出计算机分时段算出平均水位、水面坡降流量;

    youdao

  • The average value of hydrogen diffusion coefficient in metal hydride(MH) electrode was measured by constant current discharge method.

    利用流放电测定金属氢化物MH电极氢原子扩散系数平均值

    youdao

  • The normal glow discharge between the main electrodes and the rapid flow of the unpolluted gas mixtures are necessary conditions for the output of high average power for TEA CO2 laser.

    电极正常辉光放电以及使混合气快速流动且不被污染是重复频率TEA CO_2激光器实现平均功率输出重要条件

    youdao

  • The maximum diurnal average load is consistent with the peak of discharge, indicating that water and soil losses occur largely during the rain storms.

    最大平均输沙率均最大流量峰值对应,说明水土流失主要发生暴雨期间

    youdao

  • The practice results show that this method can increase 186% of average well discharge and reduce 59% of average drainage of polluted water in comparison with the conventional method.

    使用结果表明常规水井酸处理相比水井酸处理周期性负压法使水井酸处理效果平均提高186 %,酸处理后的污水排出减少5 9%。

    youdao

  • The average charge-discharge efficiency of the first 10 cycles was above 98.5% except the initial cycle.

    首次循环外,10循环充放电效率平均98.5%以上。

    youdao

  • The results indicate that the average velocity at inlet, discharge and output power of the turbine are higher when gravity is considered, but the efficiency is almost the same as that without gravity.

    计算结果表明考虑重力后,水轮机进口断面平均速度流量功率考虑重力大,效率相差不大。

    youdao

  • The results show that the average flow velocity increases with the flow discharge and the slope gradient in an exponential form, and the slope gradient has greater effect on velocity than discharge.

    结果表明面径流平均流速坡度流量增加而增大流速坡度和流量之间存在指数函数关系,坡度流速的影响大于流量。

    youdao

  • Preoperative knee joint score average 18, anterior discharge knee joint average score 68 , Follow up average score 87.

    手术前膝关节评分平均18分,出院前评分平均68分,随访平均评分87分。

    youdao

  • Conclusion Effect measures were conducted on the mainly influencing factors to shorten the average length of stay for discharge patients and adequately utilize health resources.

    结论应对影响平均住院日主要因素采取有效措施缩短出院者平均住院日,充分利用卫生资源

    youdao

  • According to the theory of equivalent of seepage discharge to volume change, a simplified formula for consolidation is derived from the concept of average excess pore water pressure.

    根据排水量等效原理,用平均孔隙压力概念推导一种简化固结计算式

    youdao

  • According to the theory of equivalent of seepage discharge to volume change, a simplified formula for consolidation is derived from the concept of average excess pore water pressure.

    根据排水量等效原理,用平均孔隙压力概念推导一种简化固结计算式

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定