The result of simulation showed that the method of water assignment putting average speed as parameter can meet the demand of slab cooling in the process of unsteady state.
模拟的结果表明,非稳态过程采用平均拉速配水能满足铸坯的冷却要求。
The result of simulation showed that the method of water assignment putting average speed as parameter can meet the demand of slab cooling in the process of unsteady state.
模拟的结果表明,非稳态过程采用平均拉速配水能满足铸坯的冷却要求。
应用推荐