• Based on the content analysis of assembly line planning, a method for assembly line planning based on standard work time and simulation is proposed, and a corresponding prototype system developed.

    在分析装配线规划内容的基础之上,提出了基于标准作业时间及系统仿真的装配线规划方法并开发了相应的原型系统。

    youdao

  • Under the condition of vehicle general assembly line, standard time is divided into value-added and non-value-added time.

    在轿车总装流水线条件下,根据作业性质将标准工时划分为增值时间与非增值时间。

    youdao

  • Under the condition of vehicle general assembly line, standard time is divided into value-added and non-value-added time.

    在轿车总装流水线条件下,根据作业性质将标准工时划分为增值时间与非增值时间。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定